Download presentation
Presentation is loading. Please wait.
Published byMeghan Crawford Modified over 9 years ago
1
Itemiser 2 Maintenance Course Introduction
2
Trace Detection ITEMISER 2 Overview Log-on and Calibration Shift Maintenance Weekly Maintenance Monthly Maintenance Questions and Comments Objectives
3
Trace Detection Traces are microscopic amounts of particles and vapor Traces are transferred to objects and people The Itemiser 2 can detect traces to a billionth of a gram, or, a grain of salt cut into 1000 pieces
4
Trace Detection Sampling Itemiser 2 Sampling Demonstration
5
Trace Detection What are explosive traces? How are explosive traces transferred? How can you describe a billionth of a gram? How do you know when the Itemiser 2 detects explosive traces? Review
6
Itemiser 2 Overview Sample Trap Holder Display Screen Desorber Printer
7
Itemiser 2 Overview Select Scan Display Screen Status Indicator Software Version List of Substances Function Buttons
8
Itemiser 2 Overview Plasmagram Display Screen Plasmagram Substance List
9
Itemiser 2 Overview Which Itemiser 2 component heats the sampling trap? Which display screen highlights a detected substance in red? What do the colors of the status indicator mean? Which display screen shows a snapshot of the last sample? How can you tell which version of software you are running? Review
10
Log-on and Calibration Log-on Demonstration
11
Log-on and Calibration Calibration introduces a known substance into the system. After the Itemiser 2 identifies the substance, the software adjusts the positions for all the other programmed substances. Calibration can be affected by changes in temperature, atmospheric pressure, and humidity. What is Calibration?
12
Log-on and Calibration Calibration Demonstration
13
Log-on and Calibration What are the different log-on numbers and their levels? Why do you calibrate the Itemiser 2 ? Which traps do you use to calibrate the Itemiser 2 ? The calibration peak is normally found between which two numbers? How often should you calibrate the Itemiser 2 ? Review
14
Shift Maintenance Calibrate Clean Fan Filter Check Printer Paper Check Supplies Decontaminate Work Area Record keeping
15
Shift Maintenance Shift Maintenance Demonstration
16
Weekly Maintenance Perform Shift Maintenance Power Down Unit Clean Desorber Inspect Filter Clean Sample Air Line Clean Membrane Calibrate Record keeping
17
Weekly Maintenance Weekly Maintenance Demonstration
18
Monthly Maintenance Power Down Unit Perform Weekly Maintenance Change Dryer Inspect Dopant Change Membrane Calibrate Record keeping
19
Monthly Maintenance Monthly Maintenance Demonstration
20
Trace Detection ITEMISER 2 Overview Log-on and Calibration Shift Maintenance Weekly Maintenance Monthly Maintenance Questions and Comments Course Review
21
Detector Schematic
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.