Sun Tracking Solar Array Team Peacock Lane Team Members: Elise King, Caitlin Greeney, Beverly Raposa & Julius Raposa Advisor: Dr. Yamayee Secondary Advisor:

Similar presentations


Presentation on theme: "Sun Tracking Solar Array Team Peacock Lane Team Members: Elise King, Caitlin Greeney, Beverly Raposa & Julius Raposa Advisor: Dr. Yamayee Secondary Advisor:"— Presentation transcript:

1 Sun Tracking Solar Array Team Peacock Lane Team Members: Elise King, Caitlin Greeney, Beverly Raposa & Julius Raposa Advisor: Dr. Yamayee Secondary Advisor: Dr. Albright Industrial Advisor: Jeff Cook (BPA) Client: Dr. Dillon

2 Project Overview Why solar? Why tracking? Demonstration for Dr. Dillon

3 Project Overview

4

5 Milestones completed Minor: Functional Specification v0.95Sept 27 Project Webpage launchedSept 27 Acquire Solar PanelsOct 11 Major: Functional Specifications v1.0 Oct 4 Component Selection Completed Oct 25

6 Additional Accomplishments Dr. Albright’s concern regarding use of photoresistors addressed. Design Decisions: 4 panels to 1 panel Only Arduino UNO Aluminum framing?

7 The Near Future Minor Milestones: Design Document v0.9Nov 1 Design Document v0.95Nov 8 November Program ReviewNov 22 Major Milestones: Design Document v1.0Nov 15 Final Budget Nov 15 All Parts OrderedNov 29

8 Design Component

9 Issues/Concerns Wire tangling – Reposition the base motor upside down Choose the more efficient/accurate photoresistor positioning – Test both configurations and select the most accurate

10 Summary Project Recap Milestones Completed Additional Accomplishments Future Milestones Design Component Issues/Concerns http://wordpress.up.edu/egr13peacocklane/ Questions???


Download ppt "Sun Tracking Solar Array Team Peacock Lane Team Members: Elise King, Caitlin Greeney, Beverly Raposa & Julius Raposa Advisor: Dr. Yamayee Secondary Advisor:"