HEPOS A look at the Transformation Between the ETRF and the Greek Reference Geodetic System INF -2357 Vaios Balis – Christos Liapakis Geotech Ltd
2
Projects’ identification Supervising authority: KTIMATOLOGIO SA “… responsible for the design, implementation and operation of the Greek Cadastral” Projects: –HEPOS-SUPPLY –HEPOS-MEAS Projects co-financed by the European Union under the operational programme “Information society”
3
HEPOS SUPPLY “Supply, installation and maintenance of the fully operational and turnkey HEllenic POsitioning System – HEPOS” Contractor: Trimble Europe B.V. Sub-contractors –Geotech Ltd Site Location Installation Operation support –OTENET SA Communication provider
4
HEPOS SUPPLY Reference stations: 100 (± 5) Duration of the project: 2 years Installation : 7 months –Site location –Reference station installation –Control center installation –Communications
5
HEPOS SUPPLY
6
98 stations 2 networks 11 single RS ETRF-2005
7
GGRS 87 Greek Geodetic Reference System 1987 Parallel to WGS 84 –Accuracy ~ 1 x 10 -5 Origin offset from WGS –+199.723 m – -74.030 m – -246.018 m Projection –Transverse Mercator –Central Meridian: 24º –Scale along central Meridian: 0.9996
8
HEPOS MEAS – Scope of the work “GPS measurements on control points of the Greek National Triangulation Network and calculation of their coordinates in HEPOS reference system (ETRF 2005, epoch 2007.5)” “Calculation of 7-parameter transformation from HEPOS reference system to GGRS 87 and vice versa” Contractor: JV Ceotech – Topomet Duration : 10 months !!!!
9
Points to be measured How many points per 1:50000 scale map sheet ? 1:50000 scale map sheet ~ 28 km ~ 22 km
10
1:50000 scale map sheets How many 1:50000 map sheets ?
11
Total number of points How many points ? –8 per each map sheet 1:50000 scale –387 1: 50000 scale map sheets –or roughly 2800 points to be measured
12
Specifications –L1/L2 GPS receivers –Occupation time: 1 hour –Logging interval: 15 sec –Elevation mask : 15º –6 satellites tracked : 90% of session time –PDOP < 4 : 75% of session time –1 Primary base station – REF (24 hours logging) –1 Secondary base station – SEC (logging until all 8 points of the map sheet have been measured)
13
GPS measurements
14
Resources 10 survey crews 2 people per survey crew 5800 L1/L2 receivers with ACU Handheld GPS for Guidance Cameras for documentation 4 WD for transportation Daily data transfers to the office 3 months field work 9 months office work
15
Pre-survey office work
16
Some measured points
17
Some non measured points
18
Total measured points 2470 points
19
Measured point documentation
20
TGO projects 128 TGO projects
21
7 parameter transformation TTC SW
22
Transformation residuals
23
Transformation accuracy 1:50000 scale map sheets –Horizontal Mean value = ± 3 cm Max Value = ± 5 cm –Vertical Mean value = ± 6 cm Max Value = ± 8 cm
24
Transformation accuracy 1:100000 scale map sheets –Horizontal Mean value = ± 6 cm Max Value = ± 9 cm –Vertical Mean value = ± 10 cm Max Value = ± 17 cm
25
7 parameter transformation (global) TTC SW
26
Residuals
27
Residuals – North Greece
28
Residuals - Islands
29
Residuals – West Greece
30
Residuals – Central Creece
31
Residuals – North East Greece
32
Shift grid files
34
Geoid
35
Accuracy HEPOS vs GGRS'87 (m) 0,037-0,040-0,031 0,014-0,0500,012 -0,007-0,0490,009 0,017-0,033-0,035 0,028-0,028-0,037 0,022-0,025-0,039 0,017-0,055-0,006 0,010-0,046-0,029 0,017-0,041-0,020
36
Survey controller application
38
Thank you for your attention…
39
Questions