E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)

Similar presentations


Presentation on theme: "E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)"— Presentation transcript:

1 E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)

2 E. KAKO (KEK) 2011' May 15 S1-Global Test 2 Construction and Test Schedule of S1-Global Cryomodule

3 E. KAKO (KEK) 2011' May 15 S1-Global Test 3 June, 2010 Mon Tue Wed Thu Fri Sat Sun Cool-down Start Heat Load Meas. at 4K to 2K 1. Low Power RF Test 2. Low Power RF Test (Tuner stroke, fo, QL) (Cal. Qt, HOM filter, Hysteresis)

4 E. KAKO (KEK) 2011' May 15 S1-Global Test 4 July, 2010 Holiday Mon Tue Wed Thu Fri Sat Sun 3. Low Power RF Test Tuner tests by INFN/FNAL/KEK Heat Load Meas. at 2K Calib. Meas. at 2K by Heater Warm up 4. Low Power RF Test Carlo, Rocco, Angello (INFN), Yuriy (FNAL) (Mechanical vibration, HOM Qext)

5 E. KAKO (KEK) 2011' May 15 S1-Global Test 5 August, 2010 Mon Tue Wed Thu Fri Sat Sun Kasokuki @ Himeji Coupler Aging Preparation Coupler Aging A-1, C-1 (maintenance)

6 E. KAKO (KEK) 2011' May 15 S1-Global Test 6 September, 2010 Holiday (Holiday) Mon Tue Wed Thu Fri Sat Sun Heat Load Meas. at 4K to 2K Coupler Processing A-1,2,3,4 C-1,2,3,4 High Gradient Exp. fo & QLA-2/C-2 D. Kostin (DESY) Coupler Processing A-1,2,3,4 C-1,2,3,4 C-4/A-4 A-2 D. Kostin (DESY) High Gradient Exp. C-2C-3C-2/C-3C-4 Cool-down Start

7 E. KAKO (KEK) 2011' May 15 S1-Global Test 7 October, 2010 Holiday Mon Tue Wed Thu Fri Sat Sun Lorentz Detuning Comp. (Dynamic Loss Meas.) A. Hocker (FNAL) Y. Pichalnikov W. Schappert (FNAL) C-1 C-2C-3 H.G. Lorentz Detuning Comp. C-4 A-2 High Gradient Exp. A-1 C-1 /(A-3) L.D.C. GDE @ CERN A-3 C-3,4 A-4 C-1,2,3,4 Trouble of cryogenic system

8 E. KAKO (KEK) 2011' May 15 S1-Global Test 8 November, 2010 (Holiday) Mon Tue Wed Thu Fri Sat Sun A-3A-2 Cx4 detune Dynamic Loss Meas. Lorentz Detuning Compensation A-2/C-4A-3/C-1A-1/C-3(A-4/C-2) C-4C-1 Dynamic Loss Meas. (Holiday) Repair of cryogenic system

9 E. KAKO (KEK) 2011' May 15 S1-Global Test 9 December, 2010 Holiday Mon Tue Wed Thu Fri Sat Sun Warm up DRFS Preparation Heat Load at 2K Calibration by Heater LLRF 7 cav. Dynamic Loss 7 Cavity Control 4 Cav. Control A x 4C x 4 Dynamic Loss A x 4 detune A x 4 coupler process (7 Cavity Control)

10 E. KAKO (KEK) 2011' May 15 S1-Global Test 10 January, 2011 Sun Mon Tue Wed Thu Fri Sat Cool-down Start Holiday

11 E. KAKO (KEK) 2011' May 15 S1-Global Test 11 February, 2011 Mon Tue Wed Thu Fri Sat Sun TTC @ Milano DRFS (1) DRFS (2) Warm up Holiday DRFS (3) Cavity Performance Check fo, QL, Eacc,max, piezo