Oncor Electric Delivery Study on Residential Electric Vehicle Charging SWEDE Conference 2012 Ron Shipman
2
1 Oncor Electric Delivery Introduction Impact of EV chargers on our system? Problems? Severity? Required Actions?
3
2 Oncor Electric Delivery Selection of Study Sites Voltage (kV) Peak Season AreaYear Built Construction Characteristics 12.5SummerFort Worth1965Overhead (OH) w/ secondary 13.2SummerDallas1965OH parallel transformers w/ secondary 12.5SummerFort Worth1976Underground (UG) w/o secondary 12.5WinterPlano1979UG w/ secondary (no flicker consideration) 24.9SummerRound Rock2006UG w/ secondary
4
3 Oncor Electric Delivery Study Parameters Modeled Distribution System Coincident Peak AMS Data Simulated Chargers Level 2 Charging Penetration Levels Multiple Scenarios
5
4 Oncor Electric Delivery CYME Subdivision Modeling
6
5 Oncor Electric Delivery CYME Subdivision Modeling (cont’d) Maximum local transformer impedance Minimum service size Modeled Triplex
7
6 Oncor Electric Delivery AMS Generated 24-Hour Load Profile
8
7 Oncor Electric Delivery Results Fuse Loading Primary Cable Loading Transformer Loading Secondary Cable Loading Service Cable Loading Voltage Drop Localized Issues
9
8 Oncor Electric Delivery Locations EV and EVGO Requested 2011 – 157 Locations 2012 - 25 Locations to Date Addressed (2) Transformers Addressed (1) Secondary Cable Installed 19 EVGO Locations
10
9 Oncor Electric Delivery Questions?