SC B5 - Protection and Automation Report to the Canadian National Committee of Cigré 2007 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie 800 de Maisonneuve est, 22ième étage Montréal, QC H2L 4M8
2
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 2 - CIGRÉ STUDY COMMITTEES B5Protection and automation System protection Substation control, automation, monitoring and recording including internal and external communications, substation metering systems and interfacing for remote control and metering All technical, organisational and economical aspects are considered including staff education and training.
3
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 3 - B5 Subcommittee Organization SC B5 Chair – Ivan Mesmaeker (CH) SC B5 Secretary – Paul Hindle (UK) Three Advisory Groups (Since August 31 31,2006) AG 51 – Substation Automation and Remote Control: Convenor J.M. Ordacgi Filho (BR) AG 52 – Protection of main plants and circuits: Convenor M.S. Sachdev (CA) AG 53 – Metering, monitoring, recording and overall power system protection: Convenor G.J. Amantegui (ES) AG 4 – Asset and Information Management: Convenor F. Koers (NL): Prior to August 31, 2006
4
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 4 - AG 51 - Substation Automation and Remote Control WG B5-11 The introduction of IEC 61850 and its impact on protection and control within substations preparing a report – expected completion 2007 WG B5-13 Acceptable functional integration in HV substations preparing a report – expected completion 2007 WG B5-36 Application for protection scheme basedon IEC 61850 preparing a report – expected completion 2009 WG B5-92 Functional testing of 61850 based systems preparing a report – expected completion 2010
5
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 5 - AG 52 – Protection of main plants and circuits WG B5-02 Coordination of digital relays and conventional instrument transformers preparing a report – expected completion 2007 WG B5-04 Modern techniques for protecting and monitoring of generating plants preparing a report – expected completion 2008 WG B5-05 Modern techniques for protecting, controlling and monitoring power transformers preparing a report – expected completion 2007 WG B5-07 Modern techniques for protecting and monitoring of transmission lines preparing a report – expected completion 2008
6
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 6 - AG 52 – Protection of main plants and circuits WG B5-10 Protection of series compensated lines and series capacitor banks preparing a report – expected completion 2007 WG B5-15 Modern applications of distance protection preparing a report – expected completion 2007 WG B5-16 Modern techniques for protecting busbars in HV networks preparing a report – expected completion 2007
7
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 7 - AG 53 – Metering, monitoring, recording and overall power system protection WG B5-03 Fault and disturbance data analysis including intelligent systems preparing a report – expected completion 2007 WG B5-19 Protection relay coordination preparing a report – expected completion 2007 WG B5-20 New trends for automated fault and disturbance recording and analysis preparing a report – expected completion 2009
8
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 8 - AG 53 – Metering, monitoring, recording and overall power system protection WG B5-08 Protection and control for dispersed generation and impact on transmission preparing a report – expected completion 2007 WG B5-34 The Impact of Renewable Energy Sources and distributed Generation on Substation Protection and Automation preparing a report – expected completion 2008 WG B5-21 New local protection and control approaches to minimize the impact of system disturbances preparing a report – expected completion 2007 TF B5-94 High impedance faults preparing a report – expected completion 2007
9
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 9 - Newly Formed WG WG B5-31 Management of protection settings preparing a report – expected completion 2009 WG B5-37 Protection, Monitoring and Control of Shunt Reactors preparing a report – expected completion 2010
10
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 10 - Canadian participation Leadership roles Simon Chano (HQ) B5 Canadian Representative B5-52 Advisory group member Convenor WG B5-07 Secretary WG B5-15 Corresponding member WG B5-19 Corresponding member B5-05 Federcio Lopez (SNC-Lavalin) Member WG B5-07 Pouria Naisani Convenor WG B5-37
11
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 11 - Canadian participation Leadership roles Mohindar S. Sachdev (U of Saskatchewan) Convenor Advisory Group 2 Web Master Member Strategic Advisory Group of SC B5 Convenor WG B5-05 Member WG B5-07 Member WG B5-15 Member WG B5-17 Brian Sparling Corresponding Member WG B5-05
12
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 12 - 2007 SC meeting Madrid, Spain October 15 to 20, 2007 Highlights: PS1: New Trends on Bus Bar Protection PS2: Acceptable Functional Integration in Substation P&C for Transmission Systems PS3: Protection of Transmission Lines & Coordination of Transmission System Protection
13
2007 - 08 -26Simon R. Chano, Hydro Québec TransÉnergie- 13 - Concluding Remarks Study committee actively examines protection and automation issues Discusses the issues and provides reports on those issues Promotes power engineering education Conducts tutorials at the SC meetings B5 tries to get participation from utility engineers, consultants and academia