Download presentation
Presentation is loading. Please wait.
Published byPierce Eric Phillips Modified over 8 years ago
2
Metra System On-Time Performance
4
Annual On-Time Performance 1984-2010
6
Ridership Trends November 2010 Metra Board of Directors Board Meeting January 14, 2011
7
Metra System Ridership Calendar Adjusted Including Free Trips November, 1983-2010 Ridership in Millions
8
Passenger Trips by Rail Line November 2009 & 2010 Passenger Trips
9
Monthly Tickets 2008 - 2010 Total Tickets Sold
10
Regional Employment Trends January 2007 - November 2010 Persons Employed (Thousands) Regional Unemployment Trends January 2007 - November 2010 Persons Unemployed
11
Average Auto Gas Prices Cook County Average Cost Per Gallon
12
Metra System Ridership Reported Ridership January-December, 1983-2010* Ridership in Millions * Anticipated year-end ridership
20
Diesel Emissions
21
Metra's Testing Timeline 3 Phases Phase 1 – Rail cars Phase 2 – Station Platforms Phase 3 – Engineer locomotive cabs, cab cars, and shops
22
Phase 1 – Rail Cars Three sampling sites per train, first two cars after engine and rear cab car Car A are the results I will show today. Car B – 50% on average reduction from A. Car C – 50% on average reduction from B.
23
Diesel Exhaust Components Particulate matter Polynuclear aromatic hydrocarbons Carbon (elemental and organic) Aldehydes Benzene Carbon monoxide Nitric Oxide Nitrogen Dioxide Sulfur Dioxide
37
Metra In-House Committees Car Group Filters – MERV-13 Test equipment to test air flow and air pressure is in shipment
38
Metra In-House Committees Funding Group DERA Grant AESS, 24 Locomotives Prototype new technology locomotive Tier 3 or Tier 4 as available
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.