Download presentation
Presentation is loading. Please wait.
Published byMyles Allison Modified over 9 years ago
1
GROUNDS ZONE ASSIGNMENT
2
WALK THE SITE GOOGLE MAPS GOOGLE EARTH SAFE SCHOOL PLANS CAFM PLOT PLANS
3
UTILIZE AUTOCAD OR PDF DRAWING USE FENCES AS BOUNDERIES SEPARATE FIELDS, BLACKTOPS, PARKING LOTS, SERVICE ROADS USE LARGE BUILDINGS AS BOUNDERIES
4
MARSHALL SH (LOC. 8750) SAFE SCHOOL PLAN USE SERVICE ROAD AS STARTING POINT FENCING AND BLDGS SEPARATE REST OF SITE
6
SAFE SCHOOL PLANSAFE SCHOOL PLAN WITH ZONES
7
THERE IS NO RIGHT OR WRONG WAY TO SEPARATE ZONES MODIFICATIONS CAN BE MADE AFTER ZONE DESIGNATIONS BY EA’S OR MAINTENANCE PLANNER HAND GRADER CAN ALSO SUGGEST ZONE DIVISIONS ONCE SURVEYED ANY CHANGES SHOULD BE MADE BEFORE ANY GROUNDS DATA IS ENTERED INTO ACCESS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.