Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.

Similar presentations


Presentation on theme: "Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI."— Presentation transcript:

1 Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

2 Task sharing Leading organization, assembling and QA including in- beam tests Assembling of modules and in-beam tests Microcables, assembling of modules Ultra light carbon fiber support and cooling, radiation test center Double sided microstrip sensors and their QA Cooling system design and prototyping FEE and sensitive material supplies

3 The base ingredients for success IBM==Igolkin+Borshchov+Merkin Access to Russian funding Recruiting of creative young people Cooperation within IBM Access to Radiation Test and in-beam test Facility

4 On the Road to CBM STS

5 2008 Tasks and their sharing Technical design and production of CF support and cooling elements @SPbSU & KRI - Igolkin’s talk + Establishing DSSDs production line @ SINP & ELMA – Merkin’s talk - Development of n-irradiation site @KRI 20 MeV cyclotron + Murin’s (Jakovlev-Lashaev) talk Upgrading prototypes testing bench with collimated Ru-106 betas @ JINR + Organizing the in-beam testing site @ Protvino + Development of microcables prototypes @ Kharkov + Procenko’s talk Development of assembling site @ Russia (Protvino or/and Dubna) + Application for budgeting + Networking @ JINR or ITEP

6 Technical design and production of CF support and cooling elements @SPbSU & KRI ( S.N. Igolkin) Details are in Sergey Igolkin’s talk

7 Establishing DSSDs production line @ SINP & ELMA ( M.M. Merkin) Details are in Michael Merkin’s talk

8 Development of n-irradiation testing site @KRI 20 MeV cyclotron (V.A. Jakovlev, S.I.Lashaev (KRI)+D.E.Karmanov, M.G.Korolev(SINP) supported by KRI Cyclotron Lab ) Equipment is purchased and implemented Neutron field studies done but need to be confirmed First batch of one sided pad diods were irradiated and analysed

9 Building Prototypes testing bench with Ru-106 betas @ JINR ( P.V. Nomokonov) URGENT NEED: n-XITER FEE electronics + demonstrators Current Activity: Preparation of infrastucture and transition to N-xyter electronics and DAQ Auxiliary electronics for demonstrator tests in 2009 on the way

10 Organizing the in-beam testing site @ Protvino First run with Demonstrator-Zero-B is scheduled for 19.11-1.12.2008 final preparations are on the way SVD-2 setup at IHEP/ 50 GeV protons with intensity up to 10 6 / spill

11 Development of microcables prototypes @ Kharkov ( V.N. Borshchov ) Demonstrator-Zero-B – talk of M.Procenko

12 Development of assembling site @ Russia (Protvino or Dubna or ?) The next Step: visiting existing ALICE assembling sites at Strassburg (done) and/or Utrecht ( rescheduled for 2009) To improve networking in FSU countries participating institutes (Skype to every member organization !) Application for the support of the 3-d Work Meeting of the Consortium (together with MVD ?) in Sortavala, Karelia, June 1-4 th,2009 (ready)

13 Milestones of the 2009 Work plan Cooling Scheme Demonstrator ? Demonstrator 1–A (technological) 1-B (electrical) 1-C (final) Description: Three 1024 strip sensors connected serially +short Al cable with pitch adapter Demonstrator 2–A (technological) 2-B (electrical) 2-C (final) Description: One 1024 strip sensor +long Al cable with pitch adapter Ladder Demonstrator Description: full scale mechanical dummy of the 4-th STS station (noncentral!) In-Beam test time table ? In-Beam test time table for 2009 ? (Protvino(April); Nuclotron (?) GSI(?)) Urgent need: Hybrid input pitch ?

14 Thank you for your attention!


Download ppt "Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI."

Similar presentations


Ads by Google