1
Internet Development Services POW 2001
2
AS-IDSSue Foffano, James Purivs2 AS-IDS Overview u Mandate: Specification, Planning, development, maintenance, support of applications to enable end-users world-wide to initiate administrative actions, perform resource planning or obtain decision support information to assist in business processes u Applications: BHT, HRT, EDH, PPT u User base: 6,500 with over 1,200/day for EDH u Human Resources: 7 Staff Members, 8 known non-Staff members for 2001 (1 Fellow, 3 Technical Students, 1 Project Associate, 2 Russian students, 1 Swedish student) ~5FTE u Financial Resources: 250K for 2001 + request for 100K for PPT project (currently not allocated)
3
AS-IDSSue Foffano, James Purivs3 AS-IDS 2000 Review u BHT Full web functionality Improved stability, administration tools, documentation Additional functionality: Team accounting, Epool Ran without problems, fully supported desipte new management Contacts and acceptability checking with key users High cost of maintenance ~60% FTE Lack of involvement in certain impacting projects e.g. Epool
4
AS-IDSSue Foffano, James Purivs4 AS-IDS 2000 Review u HRT Review of prototype using Oracle 8i features; power to the users without underlying complexity Getting 95% functionality available to users in test mode in December Positive feedback from test users High ROI on ART No new functionality for the XL users during the year Growing list of enhancement requests
5
AS-IDSSue Foffano, James Purivs5 AS-IDS 2000 Review u EDH 14 documents developed in webEDH 96% all documents routed by Oracle workflow By year end no documents created using EDH 2.1 High turn-around for user support ~<0.5 day Maintenance of 2 versions of EDH and 2 versions of workflow Planning for Leave related documents for LMS Resource situation (4 Staff -> 2 of which 1 absent 5 months) Time & level required for user support
6
AS-IDSSue Foffano, James Purivs6 AS-IDS 2000 Review u PPT Unified version for use by ATLAS & CMS New functionality; event notification, milestone support Usage increase 1,500 new tasks defined, consultation increase Scope of project not clearly defined Much time spent supervising and coaching temporary resources Overall resource problem especially since departure of “consultant”
7
AS-IDSSue Foffano, James Purivs7 AS-IDS 2000 Review - Conclusions u Majority of the planned work was completed u Tasks planned and not completed were not user-driven, but had a high cost in maintenance u Many additional tasks (unknown at POW) were handled u Maintenance & Support load still high u LMS - significant impact, planning underestimated u Critical resource situation u 7 staff members of which 3 took on new tasks & responsibilities u 1 Staff member absent 5 months u In an effort to compensate resource situation 19 temporary resources supervised throughout year u Ratio non-Staff v’s Staff unhealthy, time-consuming, ROI not optimal
8
AS-IDSSue Foffano, James Purivs8 AS-IDS 2001 Context u Fact : High Staff-to-Non-Staff Ratio u Issues : Turnover, Integration, Productivity, Maintenance, Supervision overheads, Knowledge-transfer u Solutions : Frameworks, Standards, u Fact : High User-to-Developer Ratio u Issues : Number of Support Calls, Intervention Required by Engineer, High Maintenance costs u Solutions : Help-desk, technical support, communication u Fact : High cost of Legacy code u Issues : XL HRT, Old wfm, EDH 2.1, BHT extraction (all 5 to 10 yrs old) u Solutions : Replace u Fact : Known changes u Such as: Career Structure, Oracle 8i & HR 11i, Oriac / Siriac, Euro u Solutions: Pre-empt them => Doing more with Less <=
9
AS-IDSSue Foffano, James Purivs9 AS-IDS 2001 Constraints u AVCL u 1.5 years initial version u Wider audience? Simplified procedures? u Career Structure Change u Main impact on HRT u Shockwave thru other areas (e.g. overtime system) u WOS u Impact on BHT extraction u Impact on DAI, OSVC, DTEMP, Shipping, TID in EDH u Oracle HR 11i u Main impact HRT, but also EDH
10
AS-IDSSue Foffano, James Purivs10 AS-IDS 2001 POW BHT u New Extraction u Reduce support costs u Simplify application dependencies u Automate & outsource bookclosing u ART Framework & Oracle 8i u Reduce maintenance costs u Simplify future development u Simplify current configuration u Control tools u Ensure data coherency. u Pre-empt problems u Outsource data support to FI
11
AS-IDSSue Foffano, James Purivs11 AS-IDS 2001 POW BHT Additional requests for 2001 u Extended Pipeline functionality u Project Request Form u Cern Classification System u Documentation & Training u Telephone details u BHT currently occupies 1 FTE Goal is to reduce that effort by at least half for 2002 u Resources : 1 Staff, 3-6 months Swedish Student + 0.5 Technical Student
12
AS-IDSSue Foffano, James Purivs12 AS-IDS 2001 POW HRT u Switch off Excel Version u Reduce Support Costs u More platforms & users supported via Web u Web version is cheaper to modify / support / enhance u New Career Structure u HRT is most affected application u Will have general impact on all HRT u Compatability will need to be maintained u Outstanding Enhancement Requests u Validate & Implement u Time Dimension
13
AS-IDSSue Foffano, James Purivs13 AS-IDS 2001 POW Additionally for HRT u PIE-HRT to ART u Reduce current support costs u Standardise infrastructure u ART extensions u Used by PPT, BHT and EDH u Plugs in to Oracle Graphics, Netcharts. Extendability u Admin tools u Training data u Resources : 1 staff, 1 Fellow + 0.5 Tech student
14
AS-IDSSue Foffano, James Purivs14 AS-IDS 2001 POW EDH u Switch off legacy u Stop EDH 2.1 u Stop Oracle Workflow u Stop old servers (cgi, services, edhd…) u Complete missing functionality u Web desktop/document searching u CernID and Organic Unit & username Dependency u New forms & procedures u AVCL forms (how many in 2001 ?) u AS-OP pipeline of small forms - apart from RSL form, not clear which and how many will be implemented in 2001
15
AS-IDSSue Foffano, James Purivs15 AS-IDS 2001 POW Additionally for EDH u Foundation Signature Rights Management Screen (EDHAdmin) u Maintenance of Intersection Codes (?) u Corba/Netscape server / ServletExec issues u Database merge u Import functionality for Services u AIS site u Recurrent maintenance associated with managing 6500 users & interfaces to 7 different applications (oriac, siriac, baan, foundation, gesmar, mt-jobs, lms) u Resources : 1.75 Staff, 1 Project Associate, 0.5 Technical Student, 0.5 Russian Student, (+0.5 Fellow ?)
16
AS-IDSSue Foffano, James Purivs16 AS-IDS 2001 POW PPT u Fully support ATLAS & increasingly CMS u Complete Performance Measurement & Notification System u Integrate all ATLAS Systems (currently 40% of ATLAS systems workpackage tracking is done via PPT. 100% foreseen for 2001) u Integrate CMS milestones u Implement HTML search u Use within IDS for task tracking u Continue technology optimisation - Designer ? iFS, Portal, EJB architecture u Resources: 1 Staff, 0.5 Technical Student, 2 months Russian collaborator ( -> PJAS ??)
17
AS-IDSSue Foffano, James Purivs17 AS-IDS 2001 POW
18
AS-IDSSue Foffano, James Purivs18 AS-IDS 2001 Conclusions u Numerous constraints = little flexibility u Large % of work of the group not triggered by direct user requests u Resource situation most critical in PPT u Fewer non-Staff resources, hopefully higher ROI u Good internal communication and early involvement in projects is critical u Reduce dependency, especially in EDH on Business Procedures & Corporate Applications u Reduce maintenance costs u Eliminate legacy code