Presentation is loading. Please wait.

Presentation is loading. Please wait.

© 2010 Board of Regents University of Nebraska1.  History ◦ T BAILEY, INC. – Anacortes WA  Steel tank fabrication and construction  Began building.

Similar presentations


Presentation on theme: "© 2010 Board of Regents University of Nebraska1.  History ◦ T BAILEY, INC. – Anacortes WA  Steel tank fabrication and construction  Began building."— Presentation transcript:

1 © 2010 Board of Regents University of Nebraska1

2  History ◦ T BAILEY, INC. – Anacortes WA  Steel tank fabrication and construction  Began building towers in 2001 ◦ Katana Industries – Ephrata WA  Organized in 2005 as a stand alone tower manufacturer  First plant in Ephrata, WA in 2007 ◦ Katana Summit – Columbus NE  Joint Venture of Katana Industries & Sumitomo Corporation Group formed in 2007  Began construction of state of the art manufacturing facility in late 2007/early 2008 in Columbus  Columbus facility is largest plant and corporate headquarters 2© 2010 Board of Regents University of Nebraska

3  Joint Venture Structure ◦ 50% T BAILEY, INC. – Anacortes WA ◦ 50% Sumitomo Corporation  33% Sumitomo Corporation of America  17% SC Steel LTD  Sumitomo Corporation ◦ History of more than 350 years ◦ Integrated Trading Company – with diversifications in logistics, finance and other business areas 3© 2010 Board of Regents University of Nebraska

4  Locations ◦ Columbus, NE – Corporate Headquarters & Tower Facility  140 Employees ◦ Ephrata, WA – Tower Facility  52 Employees ◦ Anacortes, WA – T BAILEY, INC. Facility (overflow)  100 Employees 4© 2010 Board of Regents University of Nebraska

5 5 Ephrata, WA  Production started in Mar 2007  Land (1.2 mil ft 2 ) / Building(106K ft 2 )  Capacity : 200 towers/year Ephrata, WA  Production started in Mar 2007  Land (1.2 mil ft 2 ) / Building(106K ft 2 )  Capacity : 200 towers/year Columbus, NE  Production started in May 2008  Land (3.3 mil ft 2 ) / Building(180K ft 2 )  Capacity : 400 towers/year Columbus, NE  Production started in May 2008  Land (3.3 mil ft 2 ) / Building(180K ft 2 )  Capacity : 400 towers/year T BAILEY, Inc. Anacortes, WA  Sister Company  Established in 1991  Tower Production since 2001 T BAILEY, Inc. Anacortes, WA  Sister Company  Established in 1991  Tower Production since 2001 © 2010 Board of Regents University of Nebraska

6  Central Plains location near center of “wind belt”  Favorable location for large and small scale projects, reducing transportation costs  Manufacturing Expertise/Availability of Personnel  Availability of Rail Transport  Work Ethic  State & Community Support of Business 6© 2010 Board of Regents University of Nebraska

7  Corporate Headquarters  Plant Capacity: 400 towers/yr  Centrally located  Outbound rail service (unit train) currently in design stage 7 Plasma/Roll/Welding 240ft(73.2m) x 400ft(121.9m) Blast/Painting/Appurtenance 160ft(48.8m) x 575ft(175.3m) © 2010 Board of Regents University of Nebraska

8 8 Building #2 Cutting Table & Beveling Wheelabrator Plate Rolling Long Seam Fit Long Seam Weld Stations Flange WeldStations Flange Fit Door Cutout & Weld Building #3 Blast PaintAssembly Staging Paint Assembly Tower Storage Plate Storage 585’ 125’ 400’ 240’ 160’ Clip & Clean / Assembly 8 lines Round Seam Fit up & Weld 8 lines © 2010 Board of Regents University of Nebraska

9 9

10 10© 2010 Board of Regents University of Nebraska

11 11© 2010 Board of Regents University of Nebraska

12 12© 2010 Board of Regents University of Nebraska

13

14

15 15© 2010 Board of Regents University of Nebraska

16 16© 2010 Board of Regents University of Nebraska

17 17© 2010 Board of Regents University of Nebraska

18 18© 2010 Board of Regents University of Nebraska

19 19© 2010 Board of Regents University of Nebraska

20 20© 2010 Board of Regents University of Nebraska

21 21© 2010 Board of Regents University of Nebraska

22 22© 2010 Board of Regents University of Nebraska


Download ppt "© 2010 Board of Regents University of Nebraska1.  History ◦ T BAILEY, INC. – Anacortes WA  Steel tank fabrication and construction  Began building."

Similar presentations


Ads by Google