Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Daya Bay Experiment to Measure  13 Herbert Steiner UC Berkeley & LBNL On behalf of the Daya Bay Collaboration Presented at the Erice School/Workshop.

Similar presentations


Presentation on theme: "The Daya Bay Experiment to Measure  13 Herbert Steiner UC Berkeley & LBNL On behalf of the Daya Bay Collaboration Presented at the Erice School/Workshop."— Presentation transcript:

1 The Daya Bay Experiment to Measure  13 Herbert Steiner UC Berkeley & LBNL On behalf of the Daya Bay Collaboration Presented at the Erice School/Workshop on "Neutrinos in Cosmology,in Astro, in Particle and in Nuclear Physics” Erice/Sicily/Italy, September 21, 2009

2 Outline Overview Physics Detector Backgrounds Calibration Schedule

3 The Daya Bay Collaboration Europe (3) (9) JINR, Dubna, Russia Kurchatov Institute, Russia Charles University, Czech Republic North America (15)(~89) BNL, Caltech, Cincinnati, George Mason Univ., LBNL, Iowa State Univ., Illinois Inst. Tech., Princeton, RPI, UC-Berkeley, UCLA, Univ. of Houston, Univ. of Wisconsin, Virginia Tech., Univ. of Illinois-Urbana-Champaign Asia (19) (~135) IHEP, Beijing Normal Univ., Chengdu Univ. of Sci. and Tech., CGNPG, CIAE, Dongguan Polytech. Univ., Nanjing Univ., Nankai Univ., Shandong Univ., Shanghai Jiaotong Univ., Shenzhen Univ., Tsinghua Univ., USTC, Zhongshan Univ., Univ. of Hong Kong, Chinese Univ. of Hong Kong, National Taiwan Univ., National Chiao Tung Univ., National United Univ. ~ 233 collaborators

4 55 km 45 km Location of the Daya Bay Nuclear Power Plant

5 1 GW th generates 2 × 10 20  e per sec The Daya Bay Nuclear Power Plant 12th most powerful in the world (11.6 GW) Top five most powerful by 2011 (17.4 GW) Adjacent to mountain, easy to construct tunnels to reach underground labs with sufficient overburden to suppress cosmic rays

6 Total length: ~3100 m Daya Bay NPP, 2  2.9 GW Ling Ao NPP, 2  2.9 GW Ling Ao-ll NPP (under construction) 2  2.9 GW in 2010 295 m Daya Bay Near site 363 m from Daya Bay Overburden: 98 m Far site 1615 m from Ling Ao 1985 m from Daya Overburden: 350 m 4 x 20 tons target mass at far site Ling Ao Near site ~500 m from Ling Ao Overburden: 112 m 810 m 465 m 900 m entrance Filling hall Construction tunnel Water hall Daya Bay Layout Horizontal Tunnel Total length 3200 m

7 Excellent overburden to reduce cosmogenic background Baselines (m): Topography

8 Tunnel Construction Status (July ‘09) Ling Ao Hall Tunnel Entrance Far Hall Daya Bay Near Hall Construction Tunnel

9 Position Sensitivity

10 How to measure  13 ? Measured ratio of Rates Proton Number Ratio Detector Efficiency Ratio sin 2 2  13 Filling Gd-LS and Mass measurement Calibration Systems Method

11 Daya Bay: Goal and Approach Utilize the Daya Bay nuclear power complex to: determine sin 2 2  13 with a sensitivity of 0.01 by measuring deficit in  e rate and spectral distortion. sin 2 2  13 = 0.01 23 4 5 6 7 8 9 10  energy (MeV)

12 Reduce systematic uncertainties: Reactor-related: Optimize baseline for best sensitivity and lowest residual errors Near and far detectors to minimize reactor-related errors Detector-related: Use “Identical” pairs of detectors to do relative measurement Fill all detectors with same batch of Gd-LS. Comprehensive program in calibration/monitoring Side-by-side calibration Background-related Go as deep as possible to reduce cosmic-induced backgrounds Enough active and passive shielding B/S ~0.4% Near B/S ~0.2% Far How to measure sin 2 2  13 to 0.01

13 Sensitivity of Daya Bay sin 2 2  13 < 0.01 @ 90% CL in 3 years of data taking 0 1 2 3 4 5 0.05 0.04 0.03 0.02 0.01 0. Number of years of data taking Sensitivity in sin 2 2  13 (90%CL) 0.38% relative detector syst. uncertainty  m 2 31 = 2.5  10  3 eV 2

14 Reactor  e Fission processes in nuclear reactors produce a huge number of low-energy  e  e /MeV/fisson Resultant  e spectrum known to ~1% 3 GW th generates 6 x 10 20  e per sec

15 Detecting  e in liquid scintillator  e  p  e + + n (prompt)  + p  D +  (2.2 MeV) (delayed)  + Gd  Gd*  Gd +  ’s (8 MeV) (delayed) Time- and energy-tagged signal is a good tool to suppress background events. Detect inverse  -decay reaction in 0.1% Gd-doped liquid scintillator: 0.3b 50,000b Energy of  e is given by: E   T e+ + T n + (m n - m p ) + m e+  T e+ + 1.8 MeV 10-40 keV

16 Detection of  e Coincidence of prompt positron and delayed neutron signals helps to suppress background events Inverse  -decay in Gd-doped liquid scintillator: Delayed Energy Signal Prompt Energy Signal. 1 MeV8 MeV 6 MeV10 MeV E e + (“ prompt”)  [1,8] MeV E n-cap (“delayed”)  [6,10] MeV t delayed -t prompt  [0.3,200]  s n-p n-Gd

17 SiteRate DYB840 LA740 Far 90 Expected Antineutrino Rates (Per Day per Module)

18 Systematic Uncertainty Control

19 Sources of Uncertainty

20 Backgrounds 740

21 Layout in DBY Hall

22 Daya Bay Antineutrino Detector 8 “identical”, 3-zone detectors target mass: 20t per detector detector mass: ~ 110t photosensors: 192 PMTs energy resolution: 12%/√E  e + p → e + + n acrylic tanks photomultipliers steel tank calibration system Gd-doped liquid scintillator mineral oil

23 Gd-Liquid Scintillator Test Production 500L fluor-LAB Two 1000L 0.5% Gd- LAB 5000L 0.1% Gd- LS 0.1% Gd-LS in 5000L tank Daya Bay experiment uses 200 ton 0.1% gadolinium-loaded liquid scintillator (Gd-LS). Gd-TMHA + LAB + 3g/L PPO + 15mg/L bis-MSB 4-ton test batch production in April 2009. Gd-LS will be produced in multiple batches but mixed in reservoir on- site, to ensure identical detectors. Gd-LS stability in prototype

24 Water Cherenkov Detector to Tag Muons

25 Calibration

26 FEE ANALOG CIRCUITS INPUT STAGE FAST ANALOG CIRCUIT for Analog Trigger THRESHOLD CIRCUIT for Multiplicity Trigger SHAPING & ADC CIRCUIT for Charge Measurement Front End Electronics

27 Civil Construction Control Room Surface Assembly BldgEntrance Inside tunnel

28 Tunnel Construction Status Pool Excavation in DBY Hall - Aug 09Main Tunnels Join - June 09

29 Detector Assembly 4-m vessel in the U.S. Stainless steel tank in China 3-m acrylic vessel in Taiwan SS Tank deliveryDelivery of 4m AV Stainless steel tank in SAB

30 AD Components 4-meter acrylic vessel arrives Unpacked 4-m acrylic vessel PMT Ladder Mounting of non-reflecting panels on ladder

31 AD Assembly

32 Schedule 2003-2007: Proposal, R&D, engineering design etc. October 2007: Ground Breaking March 2009: Surface Assembly Building occupancy Summer 2010: Daya Bay Near Hall ready for data taking Summer 2011: All near and far halls ready for data taking Three years’ data taking to reach full sensitivity.

33 Thank You !


Download ppt "The Daya Bay Experiment to Measure  13 Herbert Steiner UC Berkeley & LBNL On behalf of the Daya Bay Collaboration Presented at the Erice School/Workshop."

Similar presentations


Ads by Google