Download presentation
Presentation is loading. Please wait.
Published byCameron Stone Modified over 8 years ago
1
SksMinus status SKS meeting 2007/5/10 白鳥昂太郎
2
SksMinus setup SksMinus STOF : Time-of-flight SAC & BAC: K - beam veto and - ID (n=1.03) (SFV : K - beam veto) SDC1~4 : Beam position measurement Background Veto SMF : - from K - → - + SP0 : - from K - → - + 0 _ Trigger = K in ×PI out K in = BH1×BH2×BAC PI out = STOF×SAC×SFV×SMF×SP0 Target ~20 g/cm 2
3
SksMinus elements Drift chamber : SDC1,2 & SDC3,4 Timing counter: STOF, BH2 Aerogel Cherenkov counters : BAC, SAC (K - beam veto counter (timing counter) SFV) Beam decay veto counters : SMF, SP0 4 He target
4
SDC3&4 6 layer (x, x’, u, u’, v,v’ ( ±30°) ) (107×6 ch) Size: 2140 mm×1140 mm (20 mm wire pitch) 400 m (rms) position resolution is assumed. Highest counting rate @1.5 GeV/c (500 k/spill) 70 k/spill ⇒ 100 kHz (0.7 sec spill) 200 k/spill ⇒ 300 kHz (0.7 sec spill) @ 1.8 GeV/c
5
SDC1&2 SDC1 6 layer (x, x’, u, u’, v,v’ ( ±15°) ) (128×6 ch) Size: 384 mm×200 mm (3 mm wire pitch) Target distance : 350 mm SDC2 4 layer (x, x’, u, u’ ( ±15°) ) (112×4 ch ?) Size: 560 mm×150 mm (5 mm wire pitch) Target distance : 575 mm 400 m (rms) position resolution is assumed. Who makes SDC1 (SksPlus SDC2) ? Size → Hyperball-J frame Where is old SDC2 ? The area size of DC in clean room is 400 mm. Old SDC is 560 mm in Hasegawa D thesis.
6
STOF design STOF is made from BT used in E930 experiment. All counters of the present TOF is planned to be replaced. BT 1 segment: 85×2000×50 (x,y,z) → Half size 85×1000×50 (x,y,z) ∴ 28 segment = 2380×1000×50 (x,y,z) BT: 40 segments → 26 segments can be used for other counters. 150 ps(rms) time resolution is necessary.
7
BH2 Beam profile x =20 mm, y = 3 mm ⇒ 160 mm×25 mm (±4 ) It is possible for 1 segmented counter in E13 experiment (700 k/spill). Front image With PMT ⇒ ~400mm Target BH2 BAC1 BAC2 SAC 100~300mm200mm 250~350mm The position of BH2 is outside of the Hyperball-J frame, because of the conflict. For E13 experiment we needs an other additional counter just before the target to reduce the trigger rate. HBJ frame ~ 300mm Beam
8
BAC & SAC BAC: 160×30×75 (x,y,z) ×2 layers SAC: 300×90×75 (x,y,z) 1 or 2 layers (360×110×75 (x,y,z) ) Many fine mesh PMTs are needed. ⇔ PMTs conflicts Hyperball-J. Signal readout by fiber inside of AC
9
SMF & SP0 SMF: Iron blocks and scintillation counters Any counter can be used. (BT ?) SP0 : Range counter (E559) Range counter with lead absorber shows good performance by rough simulation.
10
4 He target The similar target used in K5 is planned. Target size is as large as possible. (Target length is less than 300 mm) Determination of size of detectors around the target and Hyperball-J is needed.
11
Time table SDC repair 、 test STOF test SP0,SAC,BAC design
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.