$18 Million Benefits of Using Ground Tire Rubber In Asphalt: Eleven Years of Success George Way, P.E. Arizona DOT
3
Flagstaff I-40 Elev. 2133 Meters 254 cm of snow Lowest Temp. -31 C
6
I-40 Traffic 20,000 VPD 35% Trucks 2.3 million ESAL’s/Year
9
Riordan Project Built 1985 25 cm HMA 15 cm Perm HMA 15 cm Drainable AB
10
RIORDAN CROSS SECTION 28 cm AC 15 cm BTB 10 cm AB Eng. Fabric Sub Grade
24
Built 1969 20 cm PCCP 18 cm CTB Clay/Cinder Subgrade
25
I-40 Pavement Badly Cracked Rough Ride High Maintenance
31
Flagstaff Overlay Crack & Seat 7.5 cm HMA 5 cm AR-HMA 1.25 cm AR-OGFC
32
FLAGSTAFF CROSS SECTION 1.25 cm AR-OGFC 5 cm AR-AC 7.5 cm AC PCCP Crack & Seat Sub Grade
33
# 200 # 100 # 50 # 40 # 30 # 16 # 10 # 8 # 4 1/4” 3/8” 1/2” 3/4”
34
Asphalt Rubber 80 % Asphalt 20 % Ground Tire Rubber
35
Percent Binder 4.6% HMA/AC-20 6.6% AR-HMA 9.0% AR-OGFC
36
Metric Ton of Mix
37
HMA-Asphalt Binder AC-20 PG 64-16
38
Asphalt Rubber Binder AC-10 PG 58-22
50
SHRP SPS-6 National Overlay Study Focus on Thickness 10 cm & 20 cm HMA Overlay
54
SHRP SPS-6 Overlay PCCP 20 cm HMA 10 cm HMA 5 cm AR-HMA/5 cm HMA
72
Cracking Flagstaff ARFlagstaff AR RiordanRiordan
73
Cracking in Meters
74
Percent Cracking
75
Benefits of AR $18 million savings Four Years Less Construction Time
76
Implementation Over 2,500 miles of AR projects built since 1990