Phase III Design Development Finalization December 23, 2008 apcosigns.com
2
Phase III Finalization The Exterior Solution How it Works
3
Phase III Finalization Exterior Wayfinding Hierarchy How the System will Work Perimeter Identifier Entrance / Drop-Off Valet Parking Campus Entrance Identifier Campus Directional Parking Lot ID 123 4
4
Phase III Finalization Wayfinding & Design Exterior Sign Placement Perimeter Identifiers - Directs Visitors to Emergency & Hospital Entrance Parking Lot ID Campus Entrance ID’s - Directs Visitors into Correct Entrance Campus Directional - Directs Visitors to Correct Building & Parking Staff or Service Entrances Wall Mounted Building ID Free-Standing Building ID “You Are Here” Locator Map
5
Phase III Finalization Exterior Wayfinding / Design Perimeter Identifiers Perimeter Identifier - Directs Visitors to Emergency & Hospital Entrance 2
6
Phase III Finalization Exterior Wayfinding / Design Perimeter Identifiers Side A Side B Location 2
7
Phase III Finalization Campus Entrance ID’s - Directs Visitors into Correct Entrance Exterior Wayfinding / Design Campus Entrance Identifiers 161735
8
Phase III Finalization Exterior Wayfinding / Design Campus Entrance Identifiers Location 16
9
Phase III Finalization Exterior Wayfinding / Design Campus Entrance Identifiers Location 17
10
Phase III Finalization Exterior Wayfinding / Design Campus Entrance Identifiers Location 35
11
Phase III Finalization Exterior Wayfinding / Design Staff / Service Entrance Identifiers Staff or Service Entrances 3 68 67 61 62 46
12
Phase III Finalization Exterior Wayfinding / Design Staff / Service Entrance Identifiers Side A Locations 3, 46, 61, 67 & 68 Side B
13
Phase III Finalization Exterior Wayfinding / Design Campus Directionals Campus Directional - Directs Visitors to Correct Building & Parking 60 36 31 24.1 18 19 13 9
14
Phase III Finalization Exterior Wayfinding / Design Campus Directionals - Primary Location 13 Side ASide B Location 9 Side ASide B Location 18 Side ASide B Location 19 Side ASide B Location 31 Side ASide B Location 36 Side ASide B
15
Phase III Finalization Exterior Wayfinding / Design Campus Directionals - Secondary / Tertiary Secondary Directional Location 24.1 Side B Tertiary Directional Location 60 Side B
16
Phase III Finalization Wayfinding Halifax Health Branding Building Branding - Identifies Building From a Distance
17
Phase III Finalization Wayfinding Branding West Location 23 South Location 66
18
Phase III Finalization Wayfinding Labeling of Building Entrances Fountain Entrance Professional Building Entrance North Tower Entrance Emergency Entrance Ambulance Entrance Oncology Center Lower Entrance Oncology Center Upper Entrance 201 Building Entrance Shuttle Entrance H&F Center Entrance
19
Phase III Finalization Wayfinding Labeling of Buildings and Entrances Fountain Entrance
20
Phase III Finalization Fountain Entrance Labeling of Buildings and Entrances New Canopy Location 23 New Canopy Location 22
21
Phase III Finalization Wayfinding Labeling of Buildings and Entrances Professional Building Entrance
22
Phase III Finalization Professional Building Entrance Professional Building Freestanding Building ID Location 29
23
Phase III Finalization Wayfinding Labeling of Buildings and Entrances North Tower Entrance
24
Phase III Finalization Professional Building Entrance North Tower Entrance Freestanding Building ID Location 30
25
Phase III Finalization Wayfinding Labeling of Buildings and Entrances Emergency Entrance
26
Phase III Finalization Professional Building Entrance Emergency Entrance Internally Illuminated Letters Location 56 Internally Illuminated Letters Locations 55 & 57 Building ID Location 54
27
Phase III Finalization Wayfinding Labeling of Buildings and Entrances Ambulance Entrance
28
Phase III Finalization Professional Building Entrance Ambulance Entrance Internally Illuminated Letters Location 64
29
Phase III Finalization Wayfinding Labeling of Buildings and Entrances Shuttle Entrance
30
Phase III Finalization Professional Building Entrance Shuttle Entrance Building ID Location 63 Cut Dimensional Copy Location 66.1
31
Phase III Finalization Wayfinding Labeling of Buildings and Entrances H&F Center Entrance
32
Phase III Finalization Professional Building Entrance Health & Fitness Center Curved Face Plaques Locations 8.1, 8
33
Phase III Finalization Wayfinding Labeling of Buildings and Entrances Oncology Center Lower Entrance Oncology Center Upper Entrance
34
Phase III Finalization Professional Building Entrance Oncology Upper & Lower Entrances Cut Dimensional Letters Location 14 Cut Dimensional Letters Location 11
35
Phase III Finalization Wayfinding Labeling of Buildings and Entrances 201 Building Entrance
36
Phase III Finalization Professional Building Entrance 201 Building
37
Phase III Finalization Exterior Wayfinding / Design “You Are Here” Locator Maps
38
Phase III Finalization Exterior Wayfinding / Design “You Are Here” Locator Maps Campus Map Freestanding Location 25, 39.1 Campus Map Wall Mount Location 20
39
Phase III Finalization Wayfinding Parking Lot Designations
40
Phase III Finalization Exterior Wayfinding / Design Parking Lot Identfiers Parking Lot ID
41
Phase III Finalization Design Parking Lot Identfiers Locations 4.1, 4.2, 4.3 Lot ID Pole Mount Locations 20.1, 20.2, 20.3, 20.4, 20.6 Lot ID Freestanding Locations 4, 5 Locations 15, 20.5, 12 Locations 26, 26.1, 27, 28 Locations 33, 33.1, 37, 38, 38.1, 38.2 Locations 39, 40, 40.1, 40.2, 41 Locations 50, 51, 52, 52.1, 52.2, 53, 58 Locations 48, 59 Locations 60.1, 60.2, 60.3 Locations 43, 44, 45, 49 Locations 64.1, 64.2 Location 21 Valet Parking Location 11.1 Locations 26.2, 26.3 Locations 38.1, 38.2 Locations 40.2, 40.3 Locations 52.1, 52.2 Location 60.3 Location 59.1
42
Phase III Finalization The Interior Solution How it Works
43
Phase III Finalization Interior Wayfinding Hierarchy How the System will Work Primary Directory Wall Mounted Directional Elevator Directory Ceiling Mounted Directional 1 2 33
44
Phase III Finalization Wayfinding Primary Directory Building ID Freestanding Location 31 Primary Directory * Lists Services for Hospital * Lists Building for Service * Lists Floor for Service * Located ED Entrance Tower Entrance Fountain Entrance Shuttle Entrance Both Ends of Connector Sizes Shown: 30” x 18” 30” x 22”
45
Phase III Finalization Wayfinding Primary Directory Building ID Freestanding Location 31
46
Phase III Finalization Wayfinding Directionals (Wall Mount) Building ID Freestanding Location 31 Primary Wall Mounted Directional * Directs to Elevators * Directs to Services on the level it is located on * Directs to Building Entrances * Located at: Primary Visitor Decision Points Where Wall Space is Available
47
Phase III Finalization Design Interior Building ID Freestanding Location 31 Room Identification
48
Phase III Finalization Wayfinding Directionals & Elevator ID (Ceiling Mount) Building ID Freestanding Location 31 Ceiling Mounted Directional * Additional Wayfinding Help * Located at: Primary Decision Points
49
Phase III Finalization Wayfinding Elevator ID & Directory Building ID Freestanding Location 31 Elevator ID & Directory * Shows Visitors Which Elevator they Viewing * Lists Services that are Accessed Using This Elevator * Shows Floor Service is Located on * Located at: Each Elevator Bank
50
ED Exam Room Numbering Final Ground Floor B D C A F H G E I J H96 H95 H94 H93 H92 H91 H90 H89 H88 H87 H86 H85 G84 G83 G82 G81 G80 G79 G78 G77 G76 G75 G74 G73 I102I101I100 I99 I98 I97 F72 F71 F70 F69 F67 F66 F65 F64 F63 F62 F61 E60 E59 E58 E57 E56 E55 E54 E53 E52 E51 E50 E49 D48 D47 D46 D45 D44 D43 D42 D41 D40D39 D38 D37 C36 C35 C34 C29 C28 C27 C26 C25 B24 B23 B22 B21 B20 B19 B18 B17 B16 B15 B14 B13 A12 A11 A10 A9 A8 A7 A6 A5 A4 A3 A2 A1 J103 J104 J105 J106 J107 C30 C31 C32 C33 J108 J109J110 Phase III Finalization
51
Phase III Finalization Building ID Freestanding Location 31 ED Exam Room Numbering Final Ground Floor
52
Phase III Finalization Wayfinding Signage Within the North Tower
53
Phase III Finalization Wayfinding Signage Within the North Tower At Ground & 1st Floor Elevator Banks
54
Phase III Finalization Wayfinding Signage Within the North Tower North End of Waiting AreaSouth End of Waiting Area
55
Phase III Finalization Wayfinding Signage Within the North Tower
56
Phase III Finalization Wayfinding Signage Within the North Tower
57
Phase III Finalization Wayfinding Interior Campus-Wide Elevator A
58
Phase III Finalization Wayfinding Interior Campus-Wide Across from Elevator A Level 1 BeforeAfter
59
Phase III Finalization Wayfinding Interior Campus-Wide BeforeAfter Main Lobby Corridor North Tower
60
Phase III Finalization Wayfinding Interior Campus-Wide Connector Corridor @ Fountain Building BeforeAfter
61
Phase III Finalization Wayfinding Interior Campus-Wide BeforeAfter Elevator B Level 1
62
Phase III Finalization Design Interior Campus-Wide Building ID Freestanding Location 31 Elevator B Level 1 BeforeAfter
63
Phase III Finalization Wayfinding Interior Campus-Wide Staff Elevator Across from B Level 1
64
Phase III Finalization Design Interior Campus-Wide Building ID Freestanding Location 31 Corridor to Radiology BeforeAfter
65
Phase III Finalization Design ADA Addition Building ID Freestanding Location 31
66
apcosigns.com Phase III Finalization