Download presentation
Presentation is loading. Please wait.
Published byAbigayle Singleton Modified over 9 years ago
1
LCG DER 7 APRIL 2015 Update on Food Security Cluster activities
2
Coordination Completed and ongoing (January-April 2015) 3 Food Security Cluster monthly meetings held Technical Working Group (TWG) meetings 1 District level FSC meeting Participation in FSN network’s knowledge sharing meeting Participation in CWG workshop and contribution to CWG guideline on Mobile Money Transfer (MMT) Review the DFP mechanism (ongoing) and DFP TOR Planned Activities for next quarter Arrange 1 meeting with key Government agencies Organise 1 half day workshop with relevant Government agencies Revise the contingency plans: Reformat the Cyclone Contingency plan and print both in Bangla and English Reformat the Flood contingency plan and print Conduct evaluation of FSC activities
3
Information Management (IM) Completed and ongoing (January-April 2015) Preparation and dissemination of FSC and TWG meeting minutes Organised 1 two day long Information Management Workshop Participated in 3 IMWG meetings Updated: FSC website FSC member’s contingency stock FSC contact directory DFP contact list Planned Activities for next quarter 1 IM workshop to develop capacity in IM tools developed by the IMWG and CWG and provide training in mobile data collection 1 GIS training (Open Source GIS software) 1 district level training on IM tools and mobile data collection 1 central level training for DFP on DFP role and IM tool Assist IMWG and DDM on use of 4W tools 1 FSC IM tools training
4
Needs Assessment (NA) Completed and ongoing (January-April 2015) 1 rapid market assessment for north-west flood response undertaken 1 Household Economy Analysis for Satkhira waterlogged region undertaken 1 Flood Recovery Assessment report prepared Planned Activities for next quarter 1 training on android based data collection system Organize training : Emergency response management EFSNA 1 sectoral loss and damage assessment
5
Integrated Phase Classification (IPC) Completed and ongoing (January-April 2015) 1IPC meeting 1 Chronic Analysis draft report prepared 1 IPC Level 1 training – training for the analysts Planned Activities for next quarter 1 training on Database management and Data analysis 1 Dissemination seminar (IPC Acute and Chronic analysis reports dissemination) 1 Acute Analysis Evaluation of IPC activities
6
Thank You!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.