TF Coil Vacuum Vessel Wire Rope Tensioning Fixture 3 Per Segment Horizontal Stop 3 Per Segment Wood Block 2 Per Segment TFTR D&D FMEA REVIEW Vacuum Vessel.

Similar presentations


Presentation on theme: "TF Coil Vacuum Vessel Wire Rope Tensioning Fixture 3 Per Segment Horizontal Stop 3 Per Segment Wood Block 2 Per Segment TFTR D&D FMEA REVIEW Vacuum Vessel."— Presentation transcript:

1 TF Coil Vacuum Vessel Wire Rope Tensioning Fixture 3 Per Segment Horizontal Stop 3 Per Segment Wood Block 2 Per Segment TFTR D&D FMEA REVIEW Vacuum Vessel Temporary Support System (VVTSS)

2 Wire Rope Tensioning Fixture 3 Per Segment Horizontal Stop 3 Per Segment Wood Block 2 Per Segment TFTR D&D FMEA REVIEW Vacuum Vessel Temporary Support System (VVTSS)

3 12 x Belleville Washers 1” Threaded Rod Tightening Nut Lock Nut Belleville Canister Bearing Plate 1” High Strength Steel Plate Use TF Coil Case Bolt Holes 1” High Strength Steel Plate Gussets ½” Steel Plate Threaded or Welded Fixture TFTR D&D FMEA REVIEW Vacuum Vessel Temporary Support System (VVTSS)

4 Redundancy 3 fixtures per TFTR Segment Robust Design Factor of Safety of 3, New Hardware Verifiable Wire rope tension can be checked at any time by measuring Belleville stack height Relatively Easy To Install and Disassemble Uses standard, well known wire rope hardware installation techniques Quick disassembly once on fixture Easy to Repair Any likely failure will occur before a segment is ever lifted TFTR D&D FMEA REVIEW Vacuum Vessel Temporary Support System (VVTSS)