Download presentation
Presentation is loading. Please wait.
Published byRonald Wilson Modified over 9 years ago
1
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo Steering Committee Meeting 23 th of January 2008 Institutional Support to the Ministry of Environment and Spatial Planning (MESP) and River Basin Authorities
2
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo 1 - Information system for water resource management Data capture and storage, exchange Laboratory analysis Reference data - GIS
3
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 1 - Information System for Water Resource Management - ActivitiesVerificationProgress Pilot project : water status assessment New data on biology, methodology developped will be used this year Biological status profile for Peja river Data collection/ needs Data catalogue and portal Data exchange protocols Memo of Understanding ICMM, MTC Data catalogue installed in the Min. Public Serv.(Security). Acces through MESP web site Quality management of lab analysis and hydrological data Consistency checks Duplication survey for water quality parameters Steps for improvement in lab. analyses, inter-laboratories exercise WISKI tools :hydro. data quality check Rating curves checked Current status reportRelevance checkedDelivered to ECLO SQL database- GIS support Permit data base structure, SQL programmer recruited, client/server application development on-going (20%)
4
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 1 : Problems / risks, plan for next period Problems/ shortcomingsConditions/risksPlan for response Availability of data: Ground water information not shared Rainfall data insufficient Junior hydro-geologist will try to access to data. Contacts and negotiation will data holders Memo of Understanding established,exchange of data not yet in routine Info shared among project partners Steps to be taken to exchange data for SQL GIS database Maintenance of data catalogue, problem of security (hacker) WISKI software routine use Work on GIS Regular contacts with partners to assess their capability and additional training where appropriate Creation of rating curvesInsufficient capability and equipment : a specific project is needed Info. available and transparent Partners sufficient resource and capacity
5
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo 2- Monitoring system Monitoring system Laboratory analysis Insure the quality of data Programme of surveillance (WFD) Storage and control in the Hydrometerological institute (HMIK) or other institutions WISKI software River Lakes Ground Water Protected zones
6
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 2 - Monitoring network improved - ActivitiesVerificationProgress Review of existing surface monitoring and proposal for improvement Annual budget and work plans monitoring system strategy proposed, well received : Hydro- Phys.Chem.- Bio. network. Monit.net. maps available for Drini Riv. Bas. Ground water acquisition plan for Drini River Basin and proposal for a ground water monitoring system Allocation decision of water resource monitoring Hydro-geologist identified and approved by ECLO ToR for procurement and installation of new equipment/infrastructure and training needs KE3 duty ToR for works on contract Drilling investigation KE3 duty
7
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 2 : Problems / risks / plan for next period Problems/ shortcomingsConditions/risksPlan Ground water information not available Junior hydro-geologist will try to access to data. Contacts and negotiation will data holders Elaboration of ToR for ground water monitoring and for drilling contract Implement the recommendations in the Data status report Importance of monitoring understood Sufficient detail and quality informed decisions for the design TOR
8
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo 3 - Modeling for water resource planning Data capture and storage, exchange Data use for planning, decision inputs Synthetic information for public and stakeholders Indicators, Water quality evaluation Tools box of models Assumptions, scenario Water demand, water balance, Realistic objectives and Plans Permit Issuing Feasibility, Involvement of stakeholders River Basin Authorities
9
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 3 – Modeling tools for water management planning ActivitiesVerificationProgress Hydrological study and preparation of data for modelling Hydrology baseline report Almost completed, data are of sufficient quality Setting up the model for Drini River Basin Model description and maps The WEAP model has been set up and is able to contribute to water balance and to scenarios analysis.. Test of the model on Radoniqi sub-basin A test was done. Calibrate model and estimate water balance and water demand Outputs water balance and demand Water balance and demand can be estimated in the pilot zone Involvement of stakeholders for improved water management planning Minutes of meetings, municipal plans A meeting and a training session raised awareness of stakeholders on modelling
10
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 3 : Problems / risks / plan for next period Problems/ shortcomingsConditions/risksPlan to response Use of model after project ends To develop a manual and propose frequent opportunities for training and practices Recent hydrological data are not sufficient and of adequate quality to be used for modelling Use old data series and collect old information on water demand to calibrate the model Use of specific techniques for estimation. Opportunities to introduce outputs in Municipal plans Effective collaboration and commitment at national and municipal level The training plan includes meeting every two months to give a momentum to this activity Availability of staff with sufficient modelling background Quality of recent and future data
11
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo 4 - Modeling for flood risks plans Data capture and storage, exchange Data use for planning, decision inputs Synthetic information for public and stakeholders Indicators, Water quality evaluation Tools box of models Flood risk Vulnerable areas Realistic objectives and Plans Flood risk maps and plans Feasibility, Involvement of stakeholders River Basin Authorities
12
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 4 – Flood and wastewater management planning ActivitiesVerificationProgress ToR for Water Supply and Sanitation Investment Plan in Kosovo A draft ToR produced for a Water Supply and Sanitation Investment Plan Assessment of basin wide flood risks Flood hazard assessment report. Flood hydrographs Flood modelling expert identified and approved by ECLO Develop a sub-basin flood management plan Flood risk maps disseminated to stakeholders Elaborate a flood management action plan Municipal development plan
13
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 4 : Problems / risks / plan for next period Problems/ shortcomingsConditions/risksPlan to response The usefulness of the investment plan has to be ensured for defining the toR A consensus on content of the works scope A donors meeting will be organise to define the content and key issues to address Delineate the inundated areas with sufficient accuracy with GIS tools Accurate and recent Digital Elevation Model To develop a manual and propose frequent opportunities for training and practices Lack of rainfalls data Lack of recent hydrological data Use of specific techniques for estimation. Collect information in the field Opportunities to introduce outputs in Municipal plans Effective collaboration and commitment at national and municipal level The training plan include meetings in Municipalities and awareness campaigns. Availability and quality of data
14
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo 5-Institutional Aspects
15
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo Steps Towards River Basin District Authorities Establishement A first draft has been submitted to the Water Department for internal discussion
16
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 5 – Institutional support to River Basin Dist. Auth. ActivitiesVerificationProgress Institutional analysis Done Proposal of functions and responsibilities of Riv. Bas. Dist. Auth Workshop proceeding Draft available not yet discussed at high level Draft a subsidiary actAdministrative protocols Draft proposed not yet discussed at high level for decision Study tour to learn about River Basin Organisation Training tours reports Planed but delayed due to change of Water Department Head and unclear commitment Propose a Drini RBDA capacity development plan Public communication on RBDA
17
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 5 : Problems / risks / plan for next period Problems/ shortcomingsConditions/risksPlan to response Willingness to progress in this issue Political commitment is ensured Further discussion on this issue in MESP After former Head of Water Department left the selection process of nomination of a new WD head is still on- going Relationship between the Water Department and the RBDA are clarified at high level. Resource to be devoted and staffing of the RBDA Evaluation of the financial need and the possibility to raise additional resource using the polluter pays principle
18
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo 6- Training Aspects
19
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 6 – Training activities – visibility – events ActivitiesVerificationProgress Assess the training need InterviewsDone for WD and HMIK Prepared a training plan reportTraining plan reportDone Organise formal training on specific subjects GIS training, English training completed WISKI training on hydrological database Organise studies tours, participation to conferences Agreement of welcoming companies. Agenda for studies tours and budget prepared Evaluation of trainingStaff appraisal sheet Feed back from training in interviews, evaluation for English and GIS training
20
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo RESULT 6 : Problems / risks / plan for next period Problems/ shortcomingsConditions/risksPlan to response Application of methodologies not possible because of inadequate equipment in WD Model and GIS tools can be run by the WD staff The issue has been raise in former Steering Committee and steps have been taken for installing new equipment Application of methodologies are not yet introduced in work plan of WD, and practice of the methodology has to be developed Production of manuals, elaboration of administrative steps and work plans including the use of recommendation and methodologies For the use of sophisticated tools, a long practice is needed before the tools can be used properly. The capacity and the technical background of the staff is sufficient for the use of the tools There is a need to hire highly specialised experts in partners organisation able to use properly the tools. Absorption capacity is not high ( reduce number of persons among partners organisation) Focus on problem solving skill to enhance self-confidence in the learning process
21
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo Outputs done in 2008 / Outputs to be done in 2009 Feb- Apr 08 Mai- July 08 Aug- Oct 08 Nov 08 Janv 09 Wk Gp G ACTIVITIES - RESULTS Information System Monitoring network Modeling tool box Flood/ WasteWater Treatment Plant Institutional support River Basin Auth. Training Data catalogue Data status report Codification -database Pilot Project Strategy monitoring- Data quality Pilot project Model set up and tested Water balance Pilot project (PP) Flood risks plans Training plan report Outputs done RBA Inst Dev. Plan To be done Draft WSS investment Plan Tor Groundwater ToR Monitoring system
22
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo ACTIVITIES PLANNED FOR NEXT PERIOD Dec 08 – Feb 09
23
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo Subjects with progress expected in the next 3 months INFORMATION SYSTEM Sql /GIS database prototype for permitting, Ground water acquisition, Data catalogue, databases for measurements data, preparation of pilot exercises MODELING WITH WEAP – River basin management Calibration of model Water demand, water balance assessment with participation of stakeholders MODELING FLOODING RISKS Study on floods events and of vulnerability of areas WATER SUPPLY AND WASTEWATER INVESTMENT PLAN Donors meeting to receive comments on the INSTITUTIONS comments on role of RBDA and on draft subsidiary act T RAINING Preparation of training tours a) Lab. Analysis, b) Institutions c) Hydrology
24
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo MANAGEMENT ISSUES - CONCLUSIONS Process of replacement of KE3 is under way More contacts and discussion about the development of River Basin District Authorities needed, Project monitoring mission and mid-term review of the project with the partners will provide opportunities to optimise allocation of project resources for project results achievement Practices of the methodologies and tools developed has to be developed New activities will start especially on flooding risks, on groundwater information acquisition and ToR for drilling contract and for monitoring
25
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo THE END Thank you for your attention
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.