Download presentation
Presentation is loading. Please wait.
Published byMilo Blankenship Modified over 9 years ago
1
CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review 25-29 June 2012, Hilton, Logan Airport No major changes in Cycle 14 13 topical panels, 1 BPP (LPs, XVPs) XVP Panel: Pundits: met Wed, voted and wrote reports Program as last year: Tues, Wed: topical panels (+XVP) Thurs, Frid: BPP (+ initial organizational session Wed evening) Reviewer Stats: 110 reviewers, including 6 pundits, 13 chairs 2 remote: Webex + telcon
2
CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14: Final Proposal Statistics 672 proposals submitted: GO 452 LP 78 XVP 17 Archive 72 Theory 53 185 approved Oversubscription (time): 5.2 Time allocation: 23.3 Ms
3
CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Proposal Statistics (cont) Time allocation: Total Time: 23.3 Ms LP: 5.7 Ms (4.2Ms) XVP: 6.2 Ms (7.4Ms)
4
CUC 10-11 Oct 2012 Chandra Director’s Office Archive/Theory Results Archive: Budget: $1050K Allocated $1095K (17) Over-subscription: 4.2 Theory: Budget: $600K Allocated: $654K (8) Over-subscription: 5.8
5
CUC 10-11 Oct 2012 Chandra Director’s Office X-ray Visionary Projects (XVP) 17 proposals submitted, time range: 1-6 Ms Total request: 41.7 Ms (5.6* over-subscribed) 4 allocated, for 1-3 Ms, range of science topics: COSMOS sky survey expansion 1.7 sq.deg. To 160 ks: 2.8 Ms Planck z<0.35 cluster survey, to complete 165: 1 Ms SMC: deep study of low Z populations: 1.1 Ms PWNe: deep observations of 3: 1.3 Ms Process: XVP panel (6 pundits) discussed all proposals and brought recommendations to BPP Topical panels discussed XVPs and LPs, as usual Final decisions made by BPP after discussion of highest- ranked proposals BPP moved ~1.2Ms to LPs (+0.2Ms from TPs) Final over-subscription for both = 6.6
6
CUC 10-11 Oct 2012 Chandra Director’s Office Multi-cycle Proposals 11 submitted for total 3.6, 2.3, 0.5 Ms in Cycles 14,15,16 (resp.) 5 approved for total 0.9, 0.6, 0.1 Ms (inc. 1 TOO) 1 of those approved included joint time w/HST
7
CUC 10-11 Oct 2012 Chandra Director’s Office Cost Proposals in Cycle 14 Deadline: 14 Sept 2012 176 proposals received and processed Confirmed: 5 not submitting (foreign PIs) Currently 19 with incomplete documentation No early observations this cycle, so all can be processed together
8
CUC 10-11 Oct 2012 Chandra Director’s Office GO Budget GO budget: $10.5M Includes: Observing, Archive ($1.05M), Theory ($0.6M) Cycle 14: overall decreasing budget projected ~$0.7M cut for first time Cycle 12-16: 15-25% increase in awarded time (orbit evolution) Cycle 13 awards: median $42K, average $54K, decrease ~10% SR2012: CXC requested GO budget augmentation to compensate decrease in budget and $/time awarded 50% of proposed augmentation was approved theory, archive funding at same level increase in GO total budget Cycle 14 awards: median $46.4K, average $59K
9
CUC 10-11 Oct 2012 Chandra Director’s Office NASA/China Restrictions and Chandra NASA GIC 12-01, 9 Feb 2012: restricting bi-lateral collaboration with China or Chinese-government owned entity RJB+MSFC personnel met with NASA HQ personnel to discuss issue China-US/China-only proposals considered bi-lateral and cannot be supported No bi-lateral China-US proposals approved in Cycle 14 All Cost PIs required to sign a form: “Assurance of Compliance” with this regulation This restriction will be explicitly included in the Cycle 15 CfP
10
CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 15: Planned Schedule CfP, POG etc. release: 13 Dec 2012 Proposal Deadline: 14 Mar 2013 Peer Review: 17-21 June 2013 Results: 12 July 2013 E-letters: by 16 August 2013 Cost Deadline: 17 Sept 2013
11
CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 15: X-ray Visionary Projects Cycle 14: 4 (of 17) proposals accepted Over-subscription 6.6 (time) Surveyed panel chairs: Generally supported balance of time (~ on category) Most did not feel XVPs were >> LPs, just larger Supported continuation of XVP-level language Cycle 15: plan to include a third XVP call Time available is significantly lower, 20 Ms (TBR): GO 11 Ms LP 4 Ms XVP 5 Ms Propose to run peer review similarly
12
CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 15: Joint Programs HST, Spitzer (reinstated), XMM-Newton, NOAO, NRAO, Suzaku Possible new joint programs: NRAO/ALMA: discussions open with new director (Beasley) for ALMA Cycle 2 NuSTAR: recently launched, contacted Harrison, Stern to open discussion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.