Download presentation
Presentation is loading. Please wait.
Published byLaura Snow Modified over 9 years ago
1
Integrating the Environment and Readiness 2004 Joint Services P2 & HWM Conference 17 August 2004 Donald R. Schregardus Donald R. Schregardus Deputy Assistant Secretary of the Navy (Environment)
2
History of Environmental Protection 1950s/60s – little to no control 1970s – Major Laws (CWA, CAA, SDWA, NEPA, etc) 1980s – Decade of compliance 1990s – P2 and waste minimization
3
DoN Current Practices HAZMIN Pollution Prevention P2 for Compliance DoD Measures of Merit Air, Water, Solid Waste, Hazardous Waste, etc
4
Hazardous Waste Disposal (CY92-CY03) Toxic Releases (TRI) (CY94-CY99) Solid Waste Diversion (CY03) 74% 45% DoN Results 76%
5
Success Story NSA Bahrain Recycled >1,500 tons of HM Saved > $3M >50% reduction in HW
6
Better Business Practices Sustainable Operations EMS/Functional Integration P2/Pursuit of Excellence Acceptance & Compliance Tolerance Denial
7
Environmental Management Systems Integrates Environmental considerations into our core business functions To continually improve environmental performance and enhance mission focus To sustain the capacity to continue our mission without compromise Uses P2 to meet service and installation goals and targets
8
EMS Status 139 # Appropriate Facilities: Goal: 100% All Areas By Dec ‘05
9
EMS Success Story NAS Joint Reserve Base Willow Grove EMS reviewed in May 04 Found to be very good Recycling efforts netted >$50K
10
Navy CHRIMP Consolidated HAZMAT Reutilization, Inventory and Management Program Cradle to Grave management of HAZMAT within Navy Currently transitioning to regional level Possible future transition to departmental level
11
CHRIMP Status 140 Navy Installations being “CHRIMPed” 40 Installations complete ECD 2008 NAVSUP is working on plan to go ‘regional’
12
CHRIMP Success Story NSB New London Manage HAZMAT for 63 tenants and USCGA Annual Cost Avoidance > $1M/yr
13
JEMMS Joint Environmental Material Management Service Cradle to Grave HAZMAT management across services DLA partnered with Navy based on Navy success with CHRIMP Currently being studied and implemented at specific areas
14
Okinawa Before JEMMS Kin Red Awase White BeachNaha Port Camp Shields Kadena Air Base Camp Lester Camp Foster/Butler MCAS Futenma Camp Kinser Camp Schwab Camp Hansen Camp Courtney Northern Training Area JWTC Ie Shima - Supply/90 day storage site - 90 day storage site
15
Okinawa After JEMMS Kin Red Awase White BeachNaha Port Camp Shields Kadena Air Base Camp Lester Camp Foster/Butler MCAS Futenma Camp Kinser Camp Schwab Camp Hansen Camp Courtney Northern Training Area JWTC Ie Shima - Supply/90 day storage site - Secondary 90 day storage site
16
Summary Building Environmental Systems and Considerations into Business Operations Reduces Cost Enhances Readiness Achieves Environmental Stewardship Goals
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.