Sprint 110 Review / Sprint 111 Planning July 1 st, 2013.

Similar presentations


Presentation on theme: "Sprint 110 Review / Sprint 111 Planning July 1 st, 2013."— Presentation transcript:

1 Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

2 Sprint Resource Pages For this sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Spri nt+110+Progress+Summary https://developer.connectopensource.org/display/NHINProgress/Spri nt+110+Progress+Summary For next sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Spri nt+111+Progress+Summary https://developer.connectopensource.org/display/NHINProgress/Spri nt+111+Progress+Summary For information on the CONNECT 4.2 release visit: https://developer.connectopensource.org/x/AoBWC https://developer.connectopensource.org/x/AoBWC 2

3 Sprint 110 Summary - Cumulative Flow 3 To Do In Progress QA Done

4 Sprint 110 Summary - Burndown Chart 4

5 Sprint 110 Summary – Sprint Statistics Points committed = 16.0 –Initial points committed – 16.0 –0 ticket was moved to sprint 111 for 0.0 –0 tickets pulled into sprint for 0.0 Points remaining (unclosed) at end of sprint = 1.0 Points completed in sprint (velocity) = 15.0 5

6 Sprint 110 - Proposed Themes Multi-Specification Identification for QD/RD –Complete any remaining QA for both responding and initiating Multi-specification identification Ensure all unit testing from Pilot and Feature tickets are incorporated into regression and validation suites Finalize Release 4.2 testing plan and begin setting up necessary infrastructure Continue working with Healtheway certification test cases (Table 2) and address any findings https://developer.connectopensource.org/display/CONNECTW IKI/Table+2+-+Test+Cases+%28subset%29https://developer.connectopensource.org/display/CONNECTW IKI/Table+2+-+Test+Cases+%28subset%29 Continue working on CI tickets or work on Adapter tickets (CONN-424/ 425) needed for certification testing 6

7 Sprint 110 - What We are Showing Today Multi-spec Message Identification CONNECT 4.2  Enhancing multi-specification version support for QD and RD (responding and initiating) (Feature request – CONN 46, 15 & 215) –Completed final remaining ticket CONN-437 Addressing Security Adapter Interfaces Updated the design document to reflect the logic for secured and unsecured interfaces –Link to initiating design approach- https://developer.connectopensource.org/x/GoA0C https://developer.connectopensource.org/x/GoA0C –Link to responding design approach - https://developer.connectopensource.org/x/kYDvBw https://developer.connectopensource.org/x/kYDvBw 7

8 Sprint 110 - What We are Showing Today Release 4.2 Release Testing Updates Test Suites –Added all feature work test cases –Ensured all tickets related to eHealth Exchange testing pilot were included Work on Testing Infrastructure –Interoperability lab environments Continued work on Release 4.2 Test Plan –Release testing planning meetings –Updates to Release 4.2 Test Plan –The Release 4.2 Testing Wiki page: https://developer.connectopensource.org/display/CON NECT4/4.2+Release+Testing https://developer.connectopensource.org/display/CON NECT4/4.2+Release+Testing 8

9 Sprint 110 - What We are Showing Today Healtheway Testing Pilot Participation in the Healtheway Pilot –Completed certificate revocation test cases –Resolved remaining work on tickets related to pilot Begin working on additional test cases for Healtheway certification (CONN-471) –Have run 95% of the draft certification test cases Most have passed, still working with CCHIT on several test areas and looking at required Adapter updates –No additional issues or tickets created to date Demo (Status on test cases) https://developer.connectopensource.org/display/CONNECTWIKI /Table+1+-+Test+Cases+%28subset%29 https://developer.connectopensource.org/display/CONNECTWIKI /Table+2+-+All+applicable+Test+Cases 9

10 Sprint 110 - What We are Showing Today CI and Automated Testing Improvements CI Running in Standard and Passthru Mode (CONN-473) –Ability switch between Standard and Passthru without restarting the server –CI will be able to perform automated test in both modes CI and Automated Test Suite in WebSphere (CONN-358) –Jenkins now running automatically running validation suite CI and Automated Test Suite in WebLogic (CONN-360) –Jenkins now running automatically running validation suite Link to Github https://issues.connectopensource.org/secure/VersionBoard.jspa? selectedProjectId=10140 10

11 Sprint 110 - What We are Showing Today Custodial Agent and Community Support Working on updates to the CONNECT Roadmap to reflect current needs and industry requirements Other tasks –Partner and Community Support –Ongoing Custodial Agent Duties Product Backlog https://issues.connectopensource.org/secure/VersionBoard.jspa? selectedProjectId=10140 11

12 Sprint 111 - Proposed Themes Finalize Release 4.2 testing plan and complete infrastructure set up Begin Release 4.2 Testing –Installation testing –Validation testing –Interoperability testing Continue working with Healtheway certification test cases (Table 2) –Any issues found will be addressed on a case by case basis –https://developer.connectopensource.org/display/CONNECTWI KI/Table+2+-+Test+Cases+%28subset%29https://developer.connectopensource.org/display/CONNECTWI KI/Table+2+-+Test+Cases+%28subset%29 Continue working on CI tickets or work on Adapter tickets (CONN-424/ 425) needed for certification testing 12

13 CONNECT 4.0 Community Announcements CONNECT Awareness –Open sprint review and planning meetings  Next sprint meeting will be July 15 th –CONNECT 4.0 Blogs and Forum posts –http://www.connectopensource.org/developer- resources/forumshttp://www.connectopensource.org/developer- resources/forums 13

14 Questions and Discussion 14