Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bongao DPP Bongao, Tawi-tawi

Similar presentations


Presentation on theme: "Bongao DPP Bongao, Tawi-tawi"— Presentation transcript:

1 Bongao DPP Bongao, Tawi-tawi
Installed capacity – 2 x 544 perkins genset Back-up for pb108, (7.2MW) Peak demand MW (grid total)

2 Manuk Mangkaw DPP Tawi-tawi
Installed capacity – 1 x 163 kw perkins Peak demand – 80 kw 6 hours operation

3 Sacol DPP Sacol Island, Zamboanga City
Installed capacity – 1 x 163 kw perkins Peak demand – 155kw 6 hours operation Plant turn over to NPC SPUG from city government of Zamboanga City

4 Sibutu Dpp Tawi-tawi Province
Installed capacity – 2 x 163 kw perkins Peak demand – 240 kw 6 hours operation

5 West Simunul DPP Tawi-tawi Province
Installed capacity – 2 x 54 kw visa, 1 x 260 kw perkins Peak demand – 220 kw 6 hours operation

6 TANDUBANAK DPP Taunguh, Sibutu Island
Unit no. 1, 1 x 280 kw Cummins Gensets Unit no. 2, 1 x 160 kw Cummins Gensets 6 hours operation, peak load 80 kw

7 Sitangkay DPP Tawi-tawi Province
Installed capacity – 2 x 280 kw cummins Started commercial operation – August 22, 2009

8 Basilan DPP Isabela City, Basilan Province
Installed capacity – 1 x 1224 kw CKD, 1 x 448 kw CKD Back up units for PB 119, 7.2 MW Rented units 2 x 1000kw, 1 x 600 kw caterpillar units are stationed here. Peak system demand – MW

9 Siasi Dpp Siasi, Sulu Installed capacity – 2 x 500 kw MAN, 2 x 560kw perkins, 2 x 260 kw perkins Peak demand – 680 kw 20 hours operation

10 Luuk DPP Camp Andres, Luuk, Sulu
Installed capacity – 1 x 175 kw cat, 1 x 54 kw visa Peak demand – 225 kw 6 hours operation

11 Manuk Mangkaw DPP East Simunul, Tawi-tawi
Installed capacity – 1 x 163 kw perkins Peak demand – 80 kw 6 hours operation

12 Jolo DPP Jolo, Sulu Installed capacity – 3 x 1.8 MW daihatsu
Peak demand – MW 24 hours operation Rented back up 1 x 1000kw, 1 x 1,500kw caterpillar

13 Mapun DPP Cagayan de Tawi-tawi
Installed capacity – 2 x 260 kw perkins, 1 x 500 kw MAN Peak demand – 350 kw 10 hours operation

14 Sibutu DPP Sibutu island, Tawi-tawi
Installed capacity – 2 x 163 kw perkins Peak demand – 240 kw 6 hours operation

15 Balimbing DPP Panglima Sugala, Bato-bato, Tawi-tawi
Installed capacity : 2 x 163 kw Perkins, 2 x 150 kw Cummins 8 hours operation, 5:00pm to 1:00am

16 Power Barge 108 Bongao, Tawi-tawi
Installed capacity – 4 x 1.8 MW daihatsu (7.2MW) Peak demand – kw 24 hours operation Backed up by land based plant

17 Power Barge 119 Isabela City, Basilan
Installed capacity – 4 x 1.8 MW daihatsu (7.2MW) Peak demand – MW 24 hours operation Backed up by land based plant and rented units

18 TANDUBAS DPP

19 SPUG MINDANAO Eastern Mindanao Area Total system capacity – KW

20 Palimbang DPP sultan kudarat
Installed capacity – 1 x 54 kw visa Peak demand – 48 kw 6 hours operation

21 Dinagat DPP (new PH) San Jose, Dinagat Island
Installed capacity – 5 x 275kw cumper, 2 x 260kw perkins, 1 x 364kw 1 x 163kw perkins Peak demand – 1.220kw 18 hours operation

22 Loreto DPP Dinagat Island
Installed capacity – 2 x 220 kw ckd, 1 x 500 kw MAN Peak demand – 290 kw 8 hours operation

23 Talicud Dpp Davao del Norte
Installed capacity – 2 x 163 kw perkins Peak demand – 160 kw 10 hours operation

24 Kalamansig DPP Sultan Kudarat
Installed capacity – 5 x 260 kw perkins, 1 x 220 kw ckd, Peak demand – kw 24 hours operation, backed up by PB 111

25 Abad Santos DPP Caburan, Davao del Sur
Installed capacity – 1 x 163kw perkins, 1 x 260 kw perkins Peak demand – 210 kw 10 hours operation

26 Balut DPP Sarangani, Davao del Sur
Installed capacity – 2 x 163 kw perkins Peak demand – 120 kw 8 hours operation

27 Hikdop DPP Hikdop, Surigao del Norte
Installed capacity – 2 x 163 kw perkins Peak demand -95 kw 7 hours operation

28 Power Barge 111 Lebak, Sultan Kudarat
Installed capacity – 4 x 560 kw perkins Peak demand – grid total kw 24 hours operation Back up power of land based plant.

29 Ninoy Aquino DPP Sultan Kudarat
Installed capacity – 2 x 163 kw perkins Peak demand – 230 kw 12 hours operation

30 Thank you PERFORMANCE GROUP courtesy of: OMAR C. ANTOCAN
MARVIN L. MADJAD RALPH P. ANTONIO


Download ppt "Bongao DPP Bongao, Tawi-tawi"

Similar presentations


Ads by Google