Design, Construction and Implementation of a Statewide Real Time Kinematic GPS Network John A. Ray Administrator Office of Aerial Engineering Ohio Department of Transportation September 21, 2004
2
Design Considerations Monument Stability Monument Stability Signal Quality Signal Quality Continuous Power Continuous Power Lightning Protection Lightning Protection Vandal Resistant Vandal Resistant Station Locations Station Locations Network Connections Network Connections Single Point Control Single Point Control Uniformity Uniformity Connectivity Connectivity Environmental Factors Environmental Factors Maintenance Maintenance
3
Monument Design
4
Form Design
5
Cabinet Design
6
Site Plan
7
Location Design (Phase 1)
8
Location Design (Phase 2)
9
Location Design (Phase 3)
10
Location Design (Phase 4)
11
Construction We elected to construct the entire system ourselves to ensure quality control, modify the design as needed and have a complete understanding of the system for maintenance activities.
12
CORS Crew L to R: Dave Beiter, Tim Burkholder, John Ray, Dave Albrecht, Rick Hentz, Jim Stafa & Greg Gerst
13
Construction Testing Location for Data Quality
14
Construction Test Hole
15
Construction Drilling Hole
16
Construction Set Reinforcing Steel
17
Construction Ditch
18
Construction Electrical Box
19
Construction Set Forms
20
Construction Pouring Concrete
21
Construction Antenna Mount
22
Construction Placing Antenna Mount
23
Construction Completed Monument (Classic)
24
Construction Completed Cabinet (Classic)
25
Construction CORS Lite Mount
26
Construction CORS Lite Cabinet
27
Implementation Rover Equipment
28
Implementation Telecommunications Solution
29
Implementation Network Adjustment
30
Implementation User Agreements Pending!
31
Implementation User Access Each user will be assigned an “IP” address with a unique user log-on and password for authentication.
32
Implementation Training / Public Awareness Numerous training sessions and public presentations are planned to make potential users aware of what is available.
33
Implementation System Management Daily monitoring Website updates NGS coordination Software Upgrades Hardware Upgrades Future planning Etc.
34
Implementation Cooperation with other entities University City Private Company County County (outside Ohio)
35
Implementation Maintenance Preventative maintenance as well as emergency repairs will be performed to ensure maximum availability.