B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1
2
BI equipment status. Sources of information Machines inspected Component statistics To be inspected Stored reserves (B879, 954, 955) Conclusion, global status. 27/05/2014 Javier SIMÓN 2
3
Introduction 27/05/2014 Javier SIMÓN 3
4
Introduction 19542014 27/05/2014 Javier SIMÓN 4
5
Sources of information 27/05/2014 Javier SIMÓN 5 Layout DB Layout drawings CDD Websites: OP, Optics, BI experts. DFS - Old drawings. Visual inspection.
6
Inspected until now. 27/05/2014 Javier SIMÓN 6
7
Lines in the Layout DB 27/05/2014 Javier SIMÓN 7
8
PS Ring 27/05/2014 Javier SIMÓN 8
9
PS Booster 27/05/2014 Javier SIMÓN 9
10
Component statistics 27/05/2014 Javier SIMÓN 10 Instrumentation and types. Layout DB discrepancies. Amount of instrumentation in lines not yet including in the layout. Total unregistered equipment. Drawing status.
11
Component statistics 27/05/2014 Javier SIMÓN 11 Data registered in the layout. LHC: just the ring. SPS: ring TI2 TI8 TT10. PX: LEIR, proton lines up to FT16.
12
Component statistics PS complex 27/05/2014 Javier SIMÓN 12
13
Component statistics 27/05/2014 Javier SIMÓN 13 Disconnected instrumentation. Inside those 478, everything is working?
14
Component statistics 27/05/2014 Javier SIMÓN 14 Disconnected instrumentation.
15
Component statistics 27/05/2014 Javier SIMÓN 15 Equipment types Drawing Status.
16
Component statistics 27/05/2014 Javier SIMÓN 16
17
Component statistics 27/05/2014 Javier SIMÓN 17 PX drawings in numbers.
18
To be inspected Before LS1 end. SPS LHC To be scheduled. AD, Isolde, target areas. 27/05/2014 Javier SIMÓN 18
19
Stored reserves 27/05/2014 Javier SIMÓN 19
20
Reserves (B879, 954, 955) 27/05/2014 Javier SIMÓN 20
21
Global status. In one word, heterogeneous. The documentation is stored in many formats, places and with different naming conventions. Amount of information: From correct and accurate, to no information, or “excessive” duplicated… Descriptions need to be improved 27/05/2014 Javier SIMÓN 21
22
27/05/2014 22 Thanks for your attention. Question time. Javier SIMÓN Hope to se you in BOSS 2.0
23
Global status. Examples. 2 names same equipment. 1 name different equipment's 27/05/2014 Javier SIMÓN 23
24
2 names same equipment. PX-UDCSPS-BPCL 27/05/2014 Javier SIMÓN 24
25
2 names same equipment. PX-UDCSPS-BPCL 27/05/2014 Javier SIMÓN 25
26
2 names same equipment. 27/05/2014 Javier SIMÓN 26
27
2 names same equipment. 27/05/2014 Javier SIMÓN 27
28
2 names same equipment. 27/05/2014 Javier SIMÓN 28
29
2 names same equipment. SPS8051001844SPSBPCLM0002 27/05/2014 Javier SIMÓN 29
30
Global status. Examples. Intro. 2 names same equipment. 1 name different equipment's. 27/05/2014 Javier SIMÓN 30
31
1 name different equipment's. BTV 27/05/2014 Javier SIMÓN 31
32
1 name different equipment's. BTV 27/05/2014 Javier SIMÓN 32
33
1 name different equipment's. BIMTVBTVMR 27/05/2014 Javier SIMÓN 33
34
Generating the list. Layout label Equipment code label 27/05/2014 Javier SIMÓN 34
35
Equipment code label 27/05/2014 Javier SIMÓN 35 Video.
36
Equipment code label 27/05/2014 Javier SIMÓN 36
37
Descriptions need to be improved. 27/05/2014 Javier SIMÓN 37