Download presentation
Presentation is loading. Please wait.
Published byDinah Green Modified over 9 years ago
1
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description of each step, including… – Requirements (LV, HV, etc.) – Depends on (cable lengths, firmware, etc.) – Description of scan (including parameter name) – How to navigate Yellow Page to measure on one chamber, crate, or endcap – Example logfile of successful scan Other stuff… – Description of TOF parameters – Description of parameters which affect timing (some indirectly) – Parameters which seem like they should be touched, but they shouldn’t – How to run scripts to… Change a few parameters in one chamber Change one parameter in many chambers Insert measured scan values back into xml file – How to accommodate a change in L1A latency https://twiki.cern.ch/twiki/bin/view/CMS/CSCsynchronizationDocuments 12 Mar 2013G. Rakness (UCLA)1
2
Finished, except for… Description of… – ALCT and CLCT TOF parameters and measurables – CSCTF timing/MPC-SP automatic timing at Resync Reference for fiber lengths (TTCrx delays) 12 Mar 2013G. Rakness (UCLA)2
3
To do Pick up neutron note – Read it again… what all is left to be done? – Likely need to pick up Chad’s analysispick up Chad’s analysis FNAL – Write seminar – Write 20 minute short talk on “technical contribution” (need details) – Continue to study upgrade TDR’s – Upgrade meetings match to CD tasks Management cleanup – RC job description – boxes for point 5 tasks General – Template for Shift leader summary elog – Understand data losses 12 Mar 2013G. Rakness (UCLA)3
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.