HUNTING CAMP FACILITY BY: Ryan Fremin ET 493 Senior Design Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode
2
PURPOSE Perform complete theoretical construction process of hunting camp facility Research Needed Location Selection Giving Structure Options Rough Drawing and Estimates Design Selection Complete drawings, schedule, and estimate
3
WHY HUNTING In 2011 there was a total of 13.7 million hunters in the United States 23 % of all wild-life recreation is found in hunting (US Census Bureau) $564,385,000 Was spent in 2011 for trip–related hunting in Louisiana $315,763,000 Was spent in 2011 for trip-related hunting in Mississippi Louisiana-16 % Mississippi- 36 %
4
RESEARCH The given statistics show that this can be a lucrative business. Current pricing for pay hunts Lodging---------$1000-$2000 Hunting-----Min------$ 4,000 (8-Point) Mississippi is in the top 15 places that hunters like to hunt Shows profitability and demand
5
DESIGN OPTIONS Luxury Will give the owner and customers a more luxurious feel with all of the necessities. Less cost effective Necessity Will give the owner and customers all of the necessities with the option of adding luxuries after design and pricing is completed. Cost Effective (Key for this build)
6
LOG CABIN Example ( Gile’s Island) Nice facility to conduct business Most need separate buildings for lodging (Total- 6700 sq.ft.) Lodging takes up possible land and reduces amount of huntable property Popular but expensive to construct
7
PRE-ENGINEERED METAL BUILDING Example ( Converted Metal Building) Cost effective Fast Construction Combines facilities into one location Gives added space for possible upgrades 40’x80’( total – 7200 sq.ft.)
8
ROUGH DRAWINGS Currently working on rough drawings to complete rough estimates. Using AUTOCAD These will help to decide type of building to use. Simple floor plan Simple layout Rough estimate
9
DESIGN DECISION After rough drawings and estimates are complete a decision will be made on the type of building to be used. Decision will be based on cost and time needed for construction.
10
EQUIPMENT NEEDED Needed equipment may be decided after estimate is complete. Due to possible location of facility specialized equipment may be needed for construction.
11
DETAILED DRAWINGS The detailed drawings will be done from the last week of the semester into the summer. This will allow sufficient time to complete drawings and estimate.
12
TIMELINE Aug 21-Aug 23Meet with advisor to discuss topic Aug 26-Aug 30Cont. Sep 2 – Sep 6Cont. Sep 9 – Sep 13Select Topic Sep 16 – Sep 20 Begin Research Sep 23 – Sep 27Prepare Proposal and Presentation Sep 30 –Oct 4Decide Possible Building Options Oct 7 –Oct 11Produce Rough Drawings for Options Oct 14 – Oct 18Cont. Oct 21- Oct 25Cont.
13
TIMELINE (CONT.) Oct 28 – Nov 1Produce Rough Estimate Nov 4- Nov 8Cont. Nov 11 – Nov 15Decide on Building Nov 18 – Nov 22Determine Equipment Needed Nov 25 – Nov 29Begin Drawings Dec 2 – Dec 6Cont./ End of Classes