Download presentation
Presentation is loading. Please wait.
Published byKory Taylor Modified over 9 years ago
1
22 June 2000 D 2000 - NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group
2
22 June 2000 D 2000 - NIU Workshop S. Doulas Muon Upgrade Detector Bottom B/C Scint Central Trigger Scint ( A- ) Forward Trigger Scint (Pixels) Forward Tracker (MDTs) Shielding PDTs
3
22 June 2000 D 2000 - NIU Workshop S. Doulas Muon Detector Status u Forward Shielding n N/S EF plugs installed n North EMC truss shielding complete, needs mounting hardware & pre-install. survey n South EMC truss shielding assembly in progress Forward Muon u Tracking Chambers - Mini-Drift Tubes n A-layer MDT’s octants(8+8) installed on N&S end Iron (EF) n C-layer MDT’s completely assembled, these are the largest (Lab F) n B-layer assembly has begun (Lab F)
4
22 June 2000 D 2000 - NIU Workshop S. Doulas Muon Detector Status u Trigger Counters n A-layer assembly started on shielding wall, shooting to have N&S on EF by early July n B&C-layer assembled and tested, in storage at Lab F.
5
22 June 2000 D 2000 - NIU Workshop S. Doulas Level 1 Triggering Purpose of Level 1 Muon Trigger (L1MU) is to identify muon candidates to Trigger Framework (TF) u L1MU decision <3.3 s after Beam crossing L1MU tools to reduce L1 trigger rates u Match L1CFT track (P T info) with scintillator hits u Timing window for scintillator hits u Forming centroids from wire chamber hits in different planes and correlations between layers L1MU triggers are user-defined u L1MU(mult,P T,eta,scint,wire,sign) n Mult:0,1,2,3 n P T :2, 4, 7, 11 GeV n eta: C, N, S, NX, SX, 1.0, 1.5, 2.0 n CFT and scintillator: L, T, X n Wire and scintillator: L, T, X n Sign: S, O, X Commissioning of pre-production muon trigger cards is in progress.
6
22 June 2000 D 2000 - NIU Workshop S. Doulas Level 2 Algorithms Level 2 (L2) is used as a rejection tool and pre-processing for Level 3 u Total L2 bandwidth ~1kHz to L3 u L2 has 3 stage processing:~100 s u Muon object finding u ID quality assignments Stage 1 - SLIC Cards u Fast calibration - T 0 subtracted scintillator hit time and PDTs have drift distances u 3D track segment finding for A and BC layers separately Stage 2 - Alpha pre-processor u Assembles 3D muon tracks u Assigns track quality (L/T) u Calculates momentum u Time stamp(prompt,slow,out-time)
7
22 June 2000 D 2000 - NIU Workshop S. Doulas Level 2 Algorithms Stage 3 - Global Level 2 u Collects muon candidates (from Alpha) and physics objects from other L2 subsystems. n Objects: Jet,EM,ME T,MU,TRK,IP u Muon Selection (Num,P T, -range,quality) u Muon Relations (Global L2 ablilities) n Isolation, angular sep., muon inside jet, CFT track match(P T, , ) u Muon candidates sent to Global and Muon Level 3 for unpacking u Global can select and correlate different L2 objects and confront them with L2 trigger menu. u Global L2 is the first instance of complete event accessibility.
8
22 June 2000 D 2000 - NIU Workshop S. Doulas Level 3 Filtering Level 3 (L3) will access the muon system and other subdetectors (CFT, SMT, Cal,...) to find muon candidates u Total L3 bandwidth ~50Hz to Tape u Time budget of 1ms L3 will: u Muon Tracking n Fits all hits w/drift distance n Uses best fit, better P and track counting u Muon Scintillator n Good TOF( t 1-2ns),correlate A and C times, fit for velocity, separate muons from low cosmics, look at opposite sides u Calorimeter n Track like object n Isolation independent z-vertex, z vtx 20cm
9
22 June 2000 D 2000 - NIU Workshop S. Doulas Level 3 Filtering u CFT n 3D matching, z vtx 1cm u SMT n Primary vertex z vtx 0.1-0.2cm, secd vtx Trigger decisions are made by Filters, Filters obtain info from tools, ScriptRunner runs Filters.
10
22 June 2000 D 2000 - NIU Workshop S. Doulas Detector Coverage Forward: Efficiency vs. and Central: Efficiency vs. and
11
22 June 2000 D 2000 - NIU Workshop S. Doulas Detector Overview Detector Thickness u Calorimeter n Varies between 5-9 interaction lengths n E min =1.6 GeV for muon exit u Iron n Varies between 7-9 interaction lengths n E min =3.3 GeV for muon exit
12
22 June 2000 D 2000 - NIU Workshop S. Doulas Current Online/DAQ Detector Readout - East Side Central Muon u 2 PDT front-end crates (B&C-layer) u 2 SCINT front-end crates (A&C-layer) Triggering on cosmics Collecting data(L1 trigger,L2,L3- format) writing to disk u Plugged into Trigger Framework Using PDT wire hit frequency and raw data for commissioning and testing FE electronics Data format looks okay Need to readout more crates Data is read offline by EXAMINE
13
22 June 2000 D 2000 - NIU Workshop S. Doulas EXAMINE Data Run 691 (C and Aphi counters)
14
22 June 2000 D 2000 - NIU Workshop S. Doulas Offline Muon ID Muon ID tools u Trigger Info n Momentum at different trigger levels? u Global track fit u Probability of missing A,B,C layers u Tracking-based isolation u Muon reconstruction in Calorimeter u Matching scintillator times, track velcity Current Muon ID u Segment reconstruction in/out toroid u Fit track in muon system (Saclay alg) n Fit track through calorimeter and toroid taking into account MCS and Energy loss u Match CT and A-layer segment n P T >1.5 GeV u Muon Particle results from successful fit n no muons <2 hits in A-layer u Muon Particle parms = CT parameters u Tracking-based isolation
15
22 June 2000 D 2000 - NIU Workshop S. Doulas Check of Muon System Performance Detector u Efficiency n # of hits in tracks and clusters u Thresholds n MDTs,PDTs, and Scintillators u Operation of calibration system u Operation of electronics Trigger u Rejection rates n Will see this w/trigger monitor (data) u Efficiencies n Compare simulation w/real data Reconstruction u Measures peaks u Efficiencies n Compare with known cross sections: W and Z’s, J/ , etc... u Muon ID Cuts n Define quality cuts
16
22 June 2000 D 2000 - NIU Workshop S. Doulas Offline Reconstruction Muon Momentum Reconstruction u Wamus, Famus: results of single track studies u Central tracking: Using mass resolution for dimuon resonances n (M ) = 3.5 GeV at Z, =1.1 n (M ) = 2.8 GeV at Z, =0 n (M ) = 45 MeV at J/ , =1.1
17
22 June 2000 D 2000 - NIU Workshop S. Doulas Offline Reconstruction Muon Reconstruction Efficiency u Current min. Requirement for Muon ID (loose muon): A-layer segment matched a w/CT track n Acceptance for A-layer segment | |<2 is 80% n CT acceptance | |<2 is ~88% u Reconstruction efficiency per loose muon is defined as the ratio of the # of reconstructed muons(MC confirmed) to all accepted trajectories n Z-> : 96% n J/ -> : 92% n Z -> bb : 95% n Note: MC muons at P T >1.5 GeV, | |<2 (yellow), reconstructed muons with MC confirmation (green)
18
22 June 2000 D 2000 - NIU Workshop S. Doulas Summary
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.