Presentation is loading. Please wait.

Presentation is loading. Please wait.

Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

Similar presentations


Presentation on theme: "Scott Craig Cody Maher Jesse Ross Brian Van Stratum."— Presentation transcript:

1 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

2  Fall 2006 ◦ Site survey ◦ Flow rate calculations ◦ Turbine research ◦ Turbine selection  Spring 2007 ◦ Economics  Turbine Cost  Dam Reconstruction  Power Company  Lifecycle Cost Analysis ◦ Environmental Impacts ◦ Overall Feasibility  Multiple Options  Recommendations

3

4

5 All in one Design Not available yet Would need two to accommodate flow at Minors Millpond

6 HydroWatt Wheel Water Wheel Factory

7 Construction Cost Estimation for Water Wheel: Demolition: Materials: Concrete and Rebar $4000.00 Consulting: $1300.00 Equipment: $3000.00 Permitting: $15.00-$25.00 Total: $45045.00

8

9 Note: No inflation is figured in these calculations

10  Buyback Rate  Tax Benefits  Rate at Which Energy Cost Increases  IEEE 1547

11  www.fsuhydroturbine.com www.fsuhydroturbine.com  Link on BlackBoard website  Will detail progress made in the spring semester of 2007  Will host all available information and multimedia obtained throughout project

12


Download ppt "Scott Craig Cody Maher Jesse Ross Brian Van Stratum."

Similar presentations


Ads by Google