Fall 2006 ◦ Site survey ◦ Flow rate calculations ◦ Turbine research ◦ Turbine selection Spring 2007 ◦ Economics Turbine Cost Dam Reconstruction Power Company Lifecycle Cost Analysis ◦ Environmental Impacts ◦ Overall Feasibility Multiple Options Recommendations
5
All in one Design Not available yet Would need two to accommodate flow at Minors Millpond
6
HydroWatt Wheel Water Wheel Factory
7
Construction Cost Estimation for Water Wheel: Demolition: Materials: Concrete and Rebar $4000.00 Consulting: $1300.00 Equipment: $3000.00 Permitting: $15.00-$25.00 Total: $45045.00
9
Note: No inflation is figured in these calculations
10
Buyback Rate Tax Benefits Rate at Which Energy Cost Increases IEEE 1547
11
www.fsuhydroturbine.com www.fsuhydroturbine.com Link on BlackBoard website Will detail progress made in the spring semester of 2007 Will host all available information and multimedia obtained throughout project