Download presentation
Presentation is loading. Please wait.
Published byDoris Walton Modified over 9 years ago
1
External Tank Arrives by Barge from MS
3
Vertical Assembly Building External Tank
4
Removing External Tank From Carrier
6
External Tank Enters VAB
7
External Tank in VAB
8
Preparing to Lift the Tank to Vertical
9
Lifting Tank
10
Solid Rockets Are Attached
11
Engines Are Attached To Solids
12
Engines Are Attached To The Shuttle In The Shuttle Processing Facility
16
Shuttle In Sling Ready For Lift In VAB
17
Shuttle Has Been Moved To VAB And And Will Be Attached To External Tank
19
Shuttle is Attached
23
Payload Preparation Room (PPR)
24
Cargo Package For ISS
25
New Module For ISS
26
Payload Ready To Be Moved to The Launch Pad
28
Payload Carrier Leaves PPR
30
Payload Being Moved To Launch Pad
31
verteilt durch www.funmail2u.dewww.funmail2u.de
32
Lifting Payload Into Position For Insertion Into Discovery When It Arrives At The Pad
35
Shuttle Discovery Leaves VAB
37
Shuttle & Crawler Launch Pad TRIP: Length--- 3 ½ mi Time--- 6-8 hours
39
Crawler Control
41
DISCOVERY ARRIVES AT PAD
45
READY FOR LAUNCH
46
We Have Lift Off
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.