Download presentation
Presentation is loading. Please wait.
Published byClara Booker Modified over 9 years ago
1
Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 Module Loading TF - Genova Site G. Darbo - INFN / Genova November 25, 2004 Copy of this talk on the CDS Agenda: http://www.ge.infn.it/ATLAS/SQTF/Minutes/Minutes_04-11-25_aux/
2
Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 2 Cooling & Thermal Cycles Cooling circuit modified: Lauda RK20-KS with Ethylene Glycol (75%) + H2O (25%) running at - 30ºC to cool the box at ~ -3º Lauda RP855C with C8F18 to cool or thermal cycle the stave. Problems encountered with Lauda chillers: Lauda RP845 break down, under repair -> Given a new and more powerful version in evaluation: RP855 -> faulty behaviour from time to time of the refrigerator… Lauda RP855 has a pressure/suction pump (see next slide) for fluid circulation in the application. We suspect that the suction generates cavitations in the C8F18 (bubbling) -> fluid lost. The system is now capable to run thermal cycles between ±30º on the power off modules (see slide)
3
Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 3 Lauda RP855 Pressure/Suction Pump
4
Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 4 Thermal Cycles
5
Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 5 Stave S4028 - Electrical Test LOAD test completed: Some dead pixel on the first row of several chip (see last week presentation) are not really bad - they respond to source. Thermal cycles done STAVE test underway
6
Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 6 S4024 - Robot Upgrade Third production stave under loading 11 modules loaded -> completed tomorrow. A Heidenhain Linear Encoder will be added to verify/correct the Z movement of the robot A better visual inspection/measure digital microscope is under evaluation to improve module positioning in the garage position and to improve the Z precision of the CMM.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.