Download presentation
Presentation is loading. Please wait.
Published bySheila Byrd Modified over 9 years ago
1
ST. LOUIS STREETCAR
2
St. Louis Streetcar www.facebook.com/STLstreetcar Goals and Objectives Increase population and employment in the corridors Increase population and employment in the corridors - Attract new residents and employers and create new jobs - Support neighborhoods and connect jobs Catalyze and support future development Catalyze and support future development - Increase economic vitality of downtown and the corridor - Increase mixed-use, transit supportive development - Improve the built environment - Create walkable, sustainable neighborhoods Integrate and complement the existing transit system Integrate and complement the existing transit system - Provide connectivity - connect with existing transit, bike and pedestrian facilities Increase ridership within the corridors and system-wide Increase ridership within the corridors and system-wide - Attract choice riders by providing passenger amenities, technologies - Increase visibility of the transit system - Reduce auto traffic and improve air quality
3
St. Louis Streetcar www.facebook.com/STLstreetcar
4
Market Analysis Strong transit corridors Strong transit corridors Employment concentration Employment concentration Residential density Residential density
5
St. Louis Streetcar www.facebook.com/STLstreetcar Development Potential New development: $540 million first five years New development: $540 million first five years $2.1 billion over 20 years $2.1 billion over 20 years
6
St. Louis Streetcar www.facebook.com/STLstreetcar Complete Streets Chestnut Street at 7 th Street Olive Street at 9 th Street Olive Street at Compton Street New lighting New lighting New trees and landscaping New trees and landscaping New technology and wayfinding – cameras and signs New technology and wayfinding – cameras and signs New sidewalks and bike paths New sidewalks and bike paths
7
St. Louis Streetcar www.facebook.com/STLstreetcar Implementation Next Steps Adopted into East-West Gateway Long Range Plan, April 2013 Adopted into East-West Gateway Long Range Plan, April 2013 Environmental Assessment Environmental Assessment Preliminary Engineering/Final Engineering Preliminary Engineering/Final Engineering Construction Construction
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.