Download presentation
Presentation is loading. Please wait.
Published byUrsula Dulcie Flynn Modified over 9 years ago
1
Wisconsin Statewide Model July 26,2006
2
Travel Forecasting & Analysis Section Forecasts for Project Development & Design Major Projects and Statewide Corridors System-wide forecasts to Calculate Level-of-Service in Metamanager Statewide Model development for Multi-Modal Planning VMT Estimation and Forecasting Output to FHWA for Program $ Apportionment Output to DNR for Environmental Air Quality Analysis Output to State Patrol & DTID for Fatality Rate Calculations Origin & Destination Studies for Local Cost Share
3
Statewide Modeling Context Systems View Synchronization Applications
4
Wisconsin Statewide Model
5
Wisconsin Network Zone
6
Wisconsin MPO Models
7
Wisconsin Regional Models
8
Regional Model NorthWest Wisconsin
9
MPO Model EauClaire / Chippewa Falls
10
System View Statewide Model Regional Model MPO Model
11
System Feedback Statewide Model Regional Model MPO Model Statewide Model Completed October 2004 Statewide Model Provides AADT Estimates to MPO Model
12
System Feedback Statewide Model Regional Model MPO Model MPO Model Completed December 2004 MPO Model Provides AADT Estimates back to Statewide Model
13
Synchronized Models Synchronized Models Provides AADT Estimates to Region Statewide Model Regional Model MPO Model Regional Model Completed December 2005
14
Traffic Analysis Forecasting Information System Produces and Warehouses AADT Estimates for Analysis TAFIS Provide Overrides Capability of Historical Based Forecasts
15
Regional Statewide MPO TAFIS Systems Interaction Source Data for: -WisDOT’s Metamanager System - WisDOT’s Corridor Management - Traffic Impact Analysis
16
Traffic Analysis Forecasting Information System (TAFIS) SAS-based forecasts utilizing historic data Produces and warehouses AADT estimates for analysis Utilizes Box-Cox regression method for Interstate, US and Wisconsin State highways
17
TAFIS Example Madison, Dane County Station Location
18
Model Application Outputs Conceptual Planning ( Alternatives Testing) Input into Paramics ( Design) Planned Projects within each MPO (Long Range Transportation Plan)
19
I- 94 Design Concepts I-94 (St. Croix County)
20
Principles Partnership with Consultants More robust AADT Estimates Realistic Design Anticipate Emerging Growth
22
Wisconsin Statewide Model Thank you
23
Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.