Presentation is loading. Please wait.

Presentation is loading. Please wait.

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332021 ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.

Similar presentations


Presentation on theme: "Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332021 ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt."— Presentation transcript:

1 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332021 ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt Herschel/Planck Project

2 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332022 Instruments Review Cycles in Perspective 1999 2000 2001 2002 2003 2004 2005 2006 2007 Instruments: ISVR IIDR IBDR IHDR IQR … IFAR Spacecraft ITT SRR PDR CDR … Phase B Phase C/D Launch

3 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332023 From Qualification to Flight Acceptance CQM at module (EQM) level : Delivery (DRB)  Test readiness (TRR)  Test review (PTR) 2005 After CQM System Campaign hold a Instrument Status Review FM at instrument level: ILT TRR  ILTs  ILT Test review prior to warm-up (PTR) 2005 To decide on need for further tests or to terminate & deliver FM at module (PLM) and system level: Delivery (DRB)  Test readiness (TRR)  Test review (PTR) 2006 In preparation of FAR Instrument Status Review

4 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332024 Herschel Status Herschel Payload Module CDR completed in July and Space Segment CDR completed in October with official close-out end 2004 Herschel EQM - Ready for Herschel CQM Focal Plane Units. All Herschel Instruments: HIFI, PACS and SPIRE have successfully completed CQM Instrument Level Tests. All instruments delivered and in ASED OTN. (N.B. SPIRE to be returned 17 th January) Instrument testing to commence April 2005 Instrument FM program underway – Baseline delivery Nov 2005

5 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332025 Herschel EQM

6 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332026 Herschel PFM status All units passed CDR, manufacturing well underway Optical bench delivered HTT delivered, most cryo-components, instrumentation, MLI integrated HOT delivered instrumentation, cryo- components and MLI mounted. Tank integrated on framework. Both fully integrated Cylinder thermal shields delivered-Others completed CVV cylinder delivered-Upper and lower bulk head imminent. Integration to be completed by May 2005; first cool-down with MTD instrument prior to shipment to ESTEC for STM campaign

7 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332027 Instrument Qualification Review - Objectives Ref: IQR Proceedings - v2 Aug 26, 2004 - SCI-PT/27108  Confirmation of instrument CQM hardware/software qualification  Completion of instrument design verification  Assessment of performance and compliance with sci. reqs  Identification and confirmation of improvements for FM  Completion of OBSW design and demonstration of functionality  Confirmation of EGSE design and demonstration of functionality  Confirmation of instrument operability - User Manual

8 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332028 IQR - Proceedings Data Package – complete delivery at K.O. [PACS] Documents as identified in SCI-PT/27108 Presentations as given during the K.O. meeting Review of Data Package [Board] Discrepancies and open issues raised as RIDs RIDs issued up to one week before co-location Answers to RIDs [PACS] Provided, discussed and resolved at co-location Board Report = Result of the three items above [Board]

9 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332029 IQR Timeline K.O. Meeting and Data Pack today Preliminary feedback 18 Jan 2005 Issue of RIDs 02 Feb 2005 Co-location 10-11 Feb 2005 Issue of Board Report 25 Feb 2005

10 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/3320210 Review Board / Representatives of third parties Herschel/Planck Project (ESTEC) G. Crone (chair) G. Pilbratt (co-chair) A. Heske (secretary) P. Estaria J. Rautakoski F. Pedersen T. van der Laan Industry Representative G. Doubrovik (Alcatel) SPIRE Representative B. Swinyard (RAL) Funding Agency Representatives M. Falvella (ASI) K. Mercier (CNES) K. Proetel (DLR) H. Schroeven-Deceuninck (Prodex) Experts D. Schink (Astrium) B. Collaudin (Alcatel) G. Coe (ESTEC) F. Marliani (ESTEC)

11 Herschel/Planck January 13, 2005PACS IQR - SCI-PT/3320211 PACS IQR K.O. - Agenda 09:00Welcome MPE 09:05Review Organization and ObjectivesESA 09:15Introduction – IHDR close-out and docsMPE 09:45Instrument Qualification Status and plans for PFMMPE Mechanical, Thermal, Electrical I/Fs and EMC, Optical 11:45PhFPU Qualification and plans for PFMCEA 12:15Ge:Ga detector arrays QualificationMPE with Coffee Break at 11:00 12:45Lunch 13:45On-Board Software and UMMPE 14:15EGSE, I-EGSE and MIBMPE 14:25CQM/AVM ILT Results MPE 15:30PA/QA StatusMPE 15:40Management and ScheduleMPE 15:55Critical Items and next stepsMPE 16:15Lessons learnt from CQM Integration in IndustryMPE 16:30Questions and ClarificationsAll 17:00First Impressions and FeedbackESA with Coffee Break at 15:15


Download ppt "Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332021 ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt."

Similar presentations


Ads by Google