1 DETER Testbed Status Kevin Lahey (ISI) Anthony D. Joseph (UCB) January 31, 2006

2 Current PC Hardware ISI ● 64 pc3000 (Dell 1850) ● 11 pc2800 (Sun V65x) ● 64 pc733 (IBM Netfinity 4500R) UCB ● 32: bpc3000 (Dell 1850) ● 32: bpc3060 (Dell 1850) ● 32 bpc2800 (Sun V60x) Approx 1/3 of nodes are currently down for repair or reserved for testing

3 Special Hardware ISI 4 Juniper M7i routers 2 Juniper IDP-200 IDS 1 Cloud Shield 2200 2 McAfee Intrushield 2600 UCB Minibed 8-32 HP DL360G2 Dual 1.4GHz/512KB PIII

4 Current Switches ISI 1 Cisco 6509 (336 GE ports) 7 Nortel 5510-48T (48 GE ports each) Gigabit Switch Interconnects UCB 1 Foundry FastIron 1500 (224 GE ports) 10 Nortel 5510-48T (48 GE ports each) Gigabit Switch Interconnects UCB Minibed 6 Nortel 5510-48T (48 GE ports each)

5 Current Configuration... pc733s pc2800s pc3000s Cisco 6509 Nortel 5510 1Gb... Junipers... bpc2800s bpc3000s Foundry FastIron 1500 Nortel 5510s 1Gb (expandable)... bpc3060s ISIUCB 1Gb VPN

6 New Hardware for 2006 ISI ● 64 Dell 1850, identical to previous pc3000s – Dual 3GHz Xeons with 2GB RAM, but with 2MB cache instead of 1MB, and 6 interfaces instead of 5 ● 32 IBM x330 (dual 1GHz Pentium IIIs with 1GB RAM) UCB ● 96+ TBD nodes, depending on overhead recovery ● Full Boss and Users nodes: – 2 HP DL360 Dual 3.4GHz/2MB Cache Xeon, 800MHz FSB, 2GB RAM – HP Modular Smart Array 20s: 12 x 500GB SATA drives (6TB) Combined ● Nortel 5510-48T and 10Gb-capable Nortel 5530-24T switches

7 New ISI Configuration... pc733s pc2800s... 2 x 10Gb... pc3000s... pc1000s pc3000s 1Gb (10Gb later) 1Gb... Junipers Cisco 6509 Nortel 5510

8 DETER Clusters ISI UCB

9 Progress (1) ● People: – New ops guy (Kevin Lahey @ isi) getting up to speed ● Reliability: – Daily backups for users and boss, 1-time tarballs for all other nodes – More robust Nortel switch configuration – ISI or UCB users/boss machines can run either or both clusters ● Security: “Panic Switch” to disconnect from Internet

10 Progress (2) ● Emulab Software: – Unified boot image for –com1 and –com2 machines – DNS servers, IP addresses in Database – Click image with polling ● Incorporated state of Emulab as of about 9/30/05 – Debugged at UCB, then installed at ISI – Firewall and experimental nodes must be resident on the same switch – Release/update procedure is still problematic – for discussion in testbed breakout

11 In-Progress (1) ● Reliability: – Automating fail-over between clusters (DB mirroring / reconciliation scripts) ● Security: – Automatic disk wiping on a project/experiment basis – Automating leak testing for control/experiment networks ● Performance: – Redoing the way emulab-in-emulab handles the control net (saves 1 experimental node interface) – Improving the performance of the VPN/IPsec links – Supporting a local tftp/frisbee server at UCB

12 In-Progress (2) ● Federation: – Supporting running federated experiments between separately administered Emulabs using emulab-in-emulab ● Netgraph module to rewrite 802.1q tags as they pass through a VPN tunnel (similar to Berkeley and ISI link) ● Configuration: – Incorporating EMIST setup/visualization tools into Dashboard ● New Emulab Hardware Types: – Supporting IBM BladeCenters (currently testing with 12x2 BC) – Routers as first-class objects

13 Network Topology ● Open hypothesis: Inter-switch links may be a bottleneck – Foundry/Cisco-Nortel and Nortel-Nortel – Adding multiple 10GE interconnects ● Exploring alternate node interconnection topologies – Example: connecting each node to multiple switches ● Potential issue: Assign is a very complex program – There may be all sorts of gotchas lurking out there

14 Other New Nodes on the Horizon ● Secure64 ● NetFPGA2 ● pc3000s with 10 interfaces ● Research Accelerator for MultiProcessing (RAMP) – 1,000 200-300 Mhz FPGA-based CPUs – Some number of elements devoted to FSM traffic generators – Many 10GE I/O ports – ~$100K for 8U box at 1.5KW