Presentation is loading. Please wait.

Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator.

Similar presentations


Presentation on theme: "Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator."— Presentation transcript:

1 Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator update and plans for next 6 months All Lunch WP5 and the final demonstratorAP + All Proposal for project extension and deliverable timetable All Plans for 3rd annual review in Brussels - tbd AOB

2 WP1 – Project Management Start M0, finish M36 CIP lead Progress to date & plans for next 6 months: –Deliverables –Financials –Audits

3 Sums Distributed EU accepted submitted costs including amendments to previous figures 3 rd year sums distributed ~ October 2008

4 Year 3 Manpower (so far)

5 Year 3 Spend Spend (so far)

6 Spend across categories

7 Progress To Date: Deliverables Deliverable No Deliverable titleDelivery date NatureDissemination level D7.1Project presentationM03PPU D1.1Mid-year technical progress reportM06RCO D2.1Optical firewall architecture with target specifications for the optical sub-systems M06RRE D2.2Outline proposals for algorithm designM06RCO D7.2Web site developmentM06PPU D4.1Optical sub-system boundary conditionsM09RCO D1.2First year technical, administrative and future plan report M12RCO D1.2bFirst year periodic activity reportM12RCO D3.1Security Applications PartitioningM12PCO D4.2Hybrid optical circuit layoutsM12RPU D4.3Outline operating conditions for optical sub- system firmware M15RCO D1.3Mid-year technical reportM18RCO D7.2bMid-term report on WISDOM exploitation and dissemination plans M18RCO D1.4Second year technical, administrative and future plan report M24RCO D1.4bSecond year periodic activity reportM24RCO

8 Next Deliverables Deliverable No Deliverable titleDelivery date NatureDissemination level D3.2Identification of simplified Security Algorithms Components M24RCO D6.1Manufactureability of the complex sub-systemsM24RPU D3.3Definition of a Security Application Programming Interface: SAPI M30RCO D4.4Hybrid Sub-system DevicesM30PPU D4.5Control firmware and software for hybrid sub-systemsM30PRE D1.5Mid-year technical reportM30RCO D5.1Optical Firewall TestbedM30PCO D5.2Firewall response to simulated security attack.M34RCO D5.3Overall performance of the firewall.M34RPU D6.2Optimum location of optical firewall and optical/electronic balance M35RRE D6.3Scaleability of the optical firewallM35RPU D1.6Third year technical and administrative reportM36RCO D1.7Final project reportM36RPU D7.3Third year report on WISDOM exploitation and dissemination plans M36RCO D7.4Route to commercialisation and exploitation including activity on raising public participation and awareness M36RRE

9 Workplanning WPMM 110 29 329 456 521 612 76

10 Manpower

11 Next 6 months WP3 & WP4 completing –Electronic controls and firmware will have been delivered –Expect first iteration of hybrid circuits (Jan) and designs for second iteration including integrated memory loop to follow WP5 will become primary focus –Need to decide on final demonstrator –Location? –Available equipment? WP6 –Scaleability in terms of speed (line rate), complexity (number of gates per device) and rule checking scaleability WP7 –OFC09, ECOC 09 –Further discussions with system companies