Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-1 Operations Management Learning Curves Module E
2
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-2 Outline LEARNING CURVES IN SERVICES AND MANUFACTURING APPLYING THE LEARNING CURVE Arithmetic Approach Logarithmic Approach Learning-Curve Coefficient Approach Strategic Implications of Learning Curves Limitations of Learning Curves
3
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-3 Learning Objectives When you complete this chapter, you should be able to Identify or Define : What a learning curve is Examples of learning curves The doubling concept Describe or Explain: How to compute learning curve effects Why learning curves are important The strategic implication of learning curves
4
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-4 Learning: Relatively permanent change in behavior due to repetition & rewards Types of learning Individual Organizational Results in ‘learning curve effect’ First observed in 1936 in airplane industry Learning
5
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-5 Time needed to produce a unit decreases with each additional unit Time needed decreases at a decreasing rate as cumulative production increases Decrease in time follows an exponential curve called learning or experience curve Learning Curve Effect
6
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-6 Learning Curve Graph Hours per unit, T N Cumulative units, N 90 % curve 80% curve T N = (100)(N log.90/log2 )
7
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-7 Examples of Learning Curve Effects ExampleImproving ParameterCumulative Parameter Learning Curve Slope (%) Time Frame 1. Model-T Ford production PriceUnits produced861910- 1926 2.Aircraft assemblyDirect labor-hours per unitUnits produced801925- 1957 3.Equipment maintenance at GE Average time to replace a group of parts Number of replacements 76Around 1957 4. Steel productionProduction worker labor-hours per unit produced Units produced791920- 1955 5.Integrated circuitsAverage price per unitUnits produced72 * 1964- 1972 6.Hand-held calculatorAverage factory selling priceUnits produced741975- 1978 7.Disk memory drivesAverage price per bitNumber of bits761975- 1978 8.Heart transplants1-year death ratesTransplants completed 791985- 1988
8
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-8 Workers’ Skills Tools Product Design Material Learning Curve Work Methods Continuous Improvement Methods Process Design Factors Affecting Learning Curves
9
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-9 Aircraft Assembly (1925-57): 80% Calculator (1975- 78): 74% Heart Transplants (1985-88): 79% © 1995 Corel Corp. Learning Curves Vary by Product and Industry
10
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-10 Internal Determine labor standards Establish labor costs & budgets Scheduling External Purchasing Subcontracting Strategic Determine volume-cost changes Evaluation of company and industry performance Learning Curve Applications
11
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-11 Lack strong theoretical justification Intermingle variables Learning effects Economies of scale Technological improvements Focus on cost not profit © 1984-1994 T/Maker Co. Criticisms of Learning Curves
12
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-12 Arithmetic approach Uses relationship: T 2 N = L * T N Useful only if values doubled Logarithmic analysis Uses relationship: T N = T 1 N log L / log 2 N = Unit of interest; T 1 = Time for unit 1 Can find time for any value of N Learning curve coefficients approach Uses relationship: T N = T 1 C (from Table) Developing Learning Curves
13
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-13 Learning Curve Coefficients Table Unit (N)80%85% Unit Time Total Time Unit Time Total Time 1…1.000 2…0.8001.8000.8501.850 3…0.7022.5020.7732.623 4…0.6403.1420.7233.345 ::::::
14
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-14 You’re a planner for Viking Ships. The first boat took 125,000 labor- hours to make. Boats 2 & 3 were produced with a learning factor of 85%. How long will the 4 th boat take so that raiding can begin? © 1995 Corel Corp. Learning Curves Example 1
15
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-15 Formula: T 2 N = L * T N 1 st unit: T 1 =125,000 hr. 2 nd unit: T 2 = L * T 1 =.85 * 125,000 =106,250 hr. 4 th unit: T 4 = L * T 2 =.85 * 106,250 =90,312 hr. Arithmetic Approach
16
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-16 Formula: T N = T 1 ( N log L / log 2 ) N = Unit of interest T 1 = Time for unit 1 L = Learning rate T 1 = 125,000 hr. 4 th unit: T 4 = T 1 ( N log L / log 2 ) =125,000 (4 log.85 / log 2 ) =90,312 hr. Logarithmic Approach
17
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-17 Formula: T N = T 1 C N = Unit of interest T 1 = Time for unit 1 C = Learning curve coefficient from table T 1 = 125,000 hr.; C =.723 from Table E3 (at 85%) 4 th unit: T 4 = T 1 C =125,000 * (.723) =90,375 hr. (rounding C ) Coefficient Approach
18
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-18 Learning Curves and Strategy 0 20 40 60 80 100 120 0100200300400 Hours per unit Cumulative units Industry average Steeper curve For a low price, high volume strategy, firm must lower unit hours & costs to maintain profit margins (i.e., steeper curve)
19
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-19 Learning Curves and Strategy To pursue a learning curve steeper than that of the industry, a firm must: follow an aggressive pricing policy focus on continuing cost reduction and productivity improvement build on shared experience keep capacity growing ahead of demand
20
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458 E-20 Industry Learning Curve for Price Compared to Company Learning Curve for Cost