Download presentation
Published byHelena Morrison Modified over 9 years ago
1
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
1100 Fairview Seattle, Washington 372,503 ft2 $90,825,000 Office Space Parking Garage Laboratories Project Team Architecture Construction Management Mechanical & Electrical Affiliated Engineers Inc. Structural KPFF Consulting Engineers Zimmer Gunsul Frasca Partnership Turner construction Company 2005 Masonry Honor Award LEED Certified Building
2
Existing Structural System
Typical Bay [30’ x 30’] 8 ½” Flat Plate w/ Drop Panels Post-Tensioned Distributed & Banded Tendons Plaza Cast in Place Reinforced Concrete Slab One-Way Slabs w/ Beams Beam Size Varies Gravity System 5th Floor Laboratories 13” Reinforced Concrete Slab Mechanical Level, Roof, & Penthouse Steel Framing W Shape Beams Rectangular HSS Columns
3
Existing Structural System
Reinforced Concrete Shear Walls 20” & 24” thick Special Boundary Elements Braced Frames (Upper Levels) Chevron Braces Lateral System Diagonal Braces X-Braces Seismic Controls Design Base Shear: 5980 kip
4
Proposed Alternative Structural Design
Proposal: Frame Main Portion of Building out of Steel Why?: Reduce Building Mass Improve Constructability Why Not the Entire Building: PLaza & Parking Garage Mechanical, Roof, & Penthouse Main Portion – the most highly occupied. - the garage is below grade - mech above level 5
5
New Structural System Floor Framing RAM Structural System
Typical Live Load: 75 lb/ft2 Composite Beams Typical Sizes W 16 x 26 W 16 x 31 Composite Girders Typical Sizes W 24 x 55 W 21 x 50 Steel Columns Typical Sizes W RAM Structural System
6
Floor Framing New Structural System Architectural Considerations
Columns – maintain location as per original design EXCEPTION: 1 Column addition Minimal Architectural Impact Floor Framing & below Level 1
7
Vibrations: Preliminary Analysis
5th Floor – Laboratory Area Evaluation for Walking Excitation ap = < 0.005 Lab Equipment is more sensitive to vibration Second analysis recommended
8
Braced Frames Concentrically Braced Frames
Simplifying the Design Process Grouped Structure down to Level 5 Ordinary Braced Frames Special Braced Frames Columns: W14 Shapes X – Bracing: Rect.HSS columns
9
Construction Management of Alternative Design
Complete Building Cost Estimate was not completed- Steel Alternative Cost was Estimated using Integrate Cost Estimating Steel Alternative Cost was Estimated using Integrate Cost Estimating Overall savings $1.8 million
10
Background Green Roof Retrofit Rainwater Retention & Detention
Benefits Rainwater Retention & Detention Offsets peak runoff from peak rainfall Lower roof surface temperature during summer helps to reduce the urban heat island effect Types of Green Roofs Extensive Semi-intensive Intensive Background Benefits Rainwater Retention & Detention Lower roof surface temperature during summer Helps to reduce the urban heat island effect
11
Green Roof: Architectural Design
Potential Areas for Green Roof Intensive roof area accessible & viewable by the existing roof terrace Extensive upper roof lower roof None stairwells small area with limited access mechanical enclosures skylights plaza Green Roof Design Decision Intensive NONE All Potential Areas
12
Green Roof: Architectural Design
[Gardendrain GR 30] Roof Construction Sedum Planting Layer 6” Roof Lite Extensive MC Root Barrier Hydrotech Gardendrain GR 30 EPDM [ Water Proofing Membrane] Rigid Insulation
13
Green Roof: Drainage Stormwater Runoff Leader Sizing
Design Rainfall: 1 inch/hour Stormwater Runoff Rational Method (Runoff Model) Typical Roof: 0.95 Lawn (Sandy Soil): 0.10 Leader Sizing Based on Projected Area & Percentage of Vertical Surface Areas Does Not consider delayed runoff rate During sustained storm event rate can reach that of typical roof Total Drainage Area: 76,425 ft2 (28) 2 inch Leaders (14) 3 inch Leaders Total Drainage Rate: 19 gpm
14
Green Roof: Construction Management
Cost Analysis [RS Means Renovation & Maintenance] Replacement w/ Ballasted EPDM @ $4.55/ft2 = $253,000 Replacement w/ Green Roof @ $6.47/ft2 = $360,000 Life Cycle [50 year period] Ballasted EPDM: $253,000 = $759,000 Extensive Sedum: 1 @ $360,000 = $360,000 Recommendation: Green Roof Time of Replacement
15
Questions ?