© 2012 IBM Corporation Platform Computing 1 IBM Platform Cluster Manager Data Center Operating System April 2013.

Similar presentations


Presentation on theme: "© 2012 IBM Corporation Platform Computing 1 IBM Platform Cluster Manager Data Center Operating System April 2013."— Presentation transcript:

1 © 2012 IBM Corporation Platform Computing 1 IBM Platform Cluster Manager Data Center Operating System April 2013

2 © 2012 IBM Corporation Platform Computing 2 IBM Platform Cluster Manager – Data Center Operating System Use Cases Datacenter Overview Optimize Datacenter Manage Datacenter from a Single Portal Meet Demand Balance Workloads Control Resources Protect Resources

3 © 2012 IBM Corporation Platform Computing 3 14 iDataPlex servers, 16 cores, 24GB memory Powered on (Connected) and idle Running RHEL KVM Automatically bare-metal provisioned when discovered Datacenter Overview

4 © 2012 IBM Corporation Platform Computing 4 Packing enabled Overcommit enabled - Nodes have 16 CPUs, a factor of two yields 32 vCPUs (i.e., one real CPU = two vCPUs)

5 © 2012 IBM Corporation Platform Computing 5 Load Balance enabled High Availability enabled Select Energy Optimization

6 © 2012 IBM Corporation Platform Computing 6 Enable Energy Optimization Power off idle hypervisors and keep at least one hypervisor connected (running) and two hypervisors on Standby Energy Optimization

7 © 2012 IBM Corporation Platform Computing 7 Click Yes

8 © 2012 IBM Corporation Platform Computing 8 View affect of the Energy Optimization Policy on the Data Center

9 © 2012 IBM Corporation Platform Computing 9 The Datacenter is idle (i.e., no workload/VMs running) The idle hypervisors will be powered off leaving one (1) connected and two (2) on standby

10 © 2012 IBM Corporation Platform Computing 10 Resources and workload (VMs) can be created and managed directly without the need for additional management portals. Click New to Create VMs Data Center Portal

11 © 2012 IBM Corporation Platform Computing 11 Select the RHEL pattern Click Instantiate

12 © 2012 IBM Corporation Platform Computing 12 Specify the number of VMs and click create

13 © 2012 IBM Corporation Platform Computing 13 The VM quickly provisions to Active Click New to create another VM

14 © 2012 IBM Corporation Platform Computing 14 Select the Win2k8 pattern

15 © 2012 IBM Corporation Platform Computing 15 Click Instantiate

16 © 2012 IBM Corporation Platform Computing 16 Specify the number of VMs and click create

17 © 2012 IBM Corporation Platform Computing 17 The VM quickly provisions to Active Select the Machines tab to see both VMs

18 © 2012 IBM Corporation Platform Computing 18 Control and manage resources directly from the portal Click Power Click Manage Click Remote Access and open a consol

19 © 2012 IBM Corporation Platform Computing 19 ********* Last login: Wed Apr 3 12:04:15 2013 from admin.ca.ibm.com [root@c445vm01 ~]# Remote consoles can be opened for the VMs and hypervisors hosts

20 © 2012 IBM Corporation Platform Computing 20 Remote consoles can be opened for the VMs and hypervisors hosts Select the Hypervisor Hosts tab

21 © 2012 IBM Corporation Platform Computing 21 Both VMs were started on the same hypervisor because the Packing policy is enabled Select the Machines tab to see the VM details Select the Cluster tab to create load on the system

22 © 2012 IBM Corporation Platform Computing 22 Meet Demand Click the Modify button and select the Add Machines command

23 © 2012 IBM Corporation Platform Computing 23 Start and additional 100 VMs to add load to the system

24 © 2012 IBM Corporation Platform Computing 24 Start and additional 100 VMs to add load to the system The additional 100 VMs are quickly provisioned and powered on Click to Refresh the view

25 © 2012 IBM Corporation Platform Computing 25 Start and additional 100 VMs to add load to the system The additional 100 VMs are quickly provisioned and powered on Click to Refresh the view

26 © 2012 IBM Corporation Platform Computing 26 Start and additional 100 VMs to add load to the system The additional 100 VMs are quickly provisioned and powered on Click to Refresh the view

27 © 2012 IBM Corporation Platform Computing 27 Start and additional 100 VMs to add load to the system The VMs are powered on, registered and ready for use Select the Hypervisor Hosts table to see changes to their states

28 © 2012 IBM Corporation Platform Computing 28 Balance Workloads The data center went from one four hypervisors to handle the additional load Additional Hypervisors were started to maintain the pool of two standby Click the Configure button and select the Demo Load command

29 © 2012 IBM Corporation Platform Computing 29 The Demo command adds load on hypervisor 03 and the CPU utilization spikes past the upper limit of 70%

30 © 2012 IBM Corporation Platform Computing 30 VMs are migrated away from host 03 to balance the workload VMs are started on the standby host and another host is powered on to maintain the two host Standby pool

31 © 2012 IBM Corporation Platform Computing 31 Manage Workloads Put a host into Maintenance mode The running VMs are automatically migrated and load balanced on other hosts To put the host into maintenance mode, click the Actions button and select the Enter Host Maintenance command

32 © 2012 IBM Corporation Platform Computing 32 The VMs running on host 03 are automatically migrated and load balanced on other hosts Additional host is started and put into standby mode to main the pool of two

33 © 2012 IBM Corporation Platform Computing 33 Protect Workloads Select the Configure button and select the Demo PFA command to create a PFA Click the Alarm icon to see the nature of the error The system will automatically migrate and balance the VMs on other hosts The automatic VM migration is a function of the High Availability policy. If a host crashes or losses power the HA policy will re-parent the VMs onto other hosts

34 © 2012 IBM Corporation Platform Computing 34 IBM Platform Cluster Manager – Data Center Operating System Manage Data Center and Resources Optimize Resources and Power Meet Demand Balance Workloads Protect Workloads


Download ppt "© 2012 IBM Corporation Platform Computing 1 IBM Platform Cluster Manager Data Center Operating System April 2013."