Presentation is loading. Please wait.

Presentation is loading. Please wait.

12/11/2015 IMT-2000 Developments in ITU-R Progress Report F. Leite, ITU-R 1GSC-9, Seoul SOURCE:ITU-R TITLE:IMT-2000 Developments in ITU-R AGENDA ITEM:4.1.

Similar presentations


Presentation on theme: "12/11/2015 IMT-2000 Developments in ITU-R Progress Report F. Leite, ITU-R 1GSC-9, Seoul SOURCE:ITU-R TITLE:IMT-2000 Developments in ITU-R AGENDA ITEM:4.1."— Presentation transcript:

1 12/11/2015 IMT-2000 Developments in ITU-R Progress Report F. Leite, ITU-R 1GSC-9, Seoul SOURCE:ITU-R TITLE:IMT-2000 Developments in ITU-R AGENDA ITEM:4.1 (Joint GTSC/GRSC) CONTACT:F. Leite, ITU-R, leite@itu.int, Tel: +4122 730 5940leite@itu.int GSC9/JOINT_010

2 GSC-9, Seoul IMT-2000: The Plan (Source: Rec. ITU-R M.1645 (Framework)) 2000 2003 20062009 2012 2015 2000 2003 20062009 2012 2015 2000 2003 20062009 2012 2015 2000 2003 20062009 2012 2015 Other radio systems Evolution / Integration with other radio systems Indicates that the exact starting point is not yet fixed Possible spectrum identification at the WRC-07 Possible wide deployment around the year 2015 in some countries Systems Deployment Spectrum Implementation New elements to offer capabilities of systems beyond IMT-2000 FrameworkRequirementsStandardization

3 GSC-9, Seoul IMT-2000: Capabilities (‘The Van’) (Source: Rec. ITU-R M.1645 (Framework) interconnection IMT-2000 Mobility Low High 1101001000 Peak Useful Data Rate (Mb/s) Enhanced IMT-2000 Enhancement IMT-2000 Mobility Low High 1101001000 Peak Useful Data Rate (Mbit/s) Area Wireless Access Enhanced IMT -2000 Enhancemen t Digital Broadcast Systems Nomadic / Local Area Access Systems New Nomadic / Local Systems beyond IMT-2000 will encompass the capabilities of previous systems New capabilities of systems beyond Dashed line indicates that the exact data rates associated with systems beyond IMT-2000 are not yet determined New Mobile Access

4 GSC-9, Seoul IMT-2000: Spectrum - WRC-07 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 WRC03 (RES228) WRC07 WRC Future Services / Market Analysis Draft text for WRC-07; Spectrum Estimate Candidate freq ranges When What for / name Methods to satisfy agenda Footnote text Pooled / Shared / Paired / etc ? Future Spectrum Calculation Methodology Future Spectrum Estimate Spectrum Survey Future technology assumptions Sharing Studies WP8F WRC Preparations WP8F Other Spectrum Related Activities 2.5 GHz Spectrum Plan Radio Aspects

5 GSC-9, Seoul IMT-2000: Spectrum 2 500-2 690 MHz: Frequency arrangement to be finalized in October 2004 REC. ITU-R M.1036-2 alignment? Global

6 GSC-9, Seoul IMT-2000: Systems beyond Research activities ITU-R WP 8F Radio interface; radio access network; spectrum; service & market Creation of a single body to develop specifications for Systems Beyond IMT-2000 Framework: Fusion of systems; “van” model (100M-1G bit/s) REC. M.1645 Focus areas* Resolution GSC-8/3 R&D Fora & other Ext. Orgs. *) http://www.itu.int/ITU-R/study-groups/rsg8/rwp8f/docs/focus-areas.dochttp://www.itu.int/ITU-R/study-groups/rsg8/rwp8f/docs/focus-areas.doc

7 GSC-9, Seoul IMT-2000: deliverables work plan blue light blue


Download ppt "12/11/2015 IMT-2000 Developments in ITU-R Progress Report F. Leite, ITU-R 1GSC-9, Seoul SOURCE:ITU-R TITLE:IMT-2000 Developments in ITU-R AGENDA ITEM:4.1."

Similar presentations


Ads by Google