Download presentation
Presentation is loading. Please wait.
Published byMillicent Hamilton Modified over 9 years ago
1
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Mar 13
2
Preparations continue Tuning up the trigger system Check out subsystem monitoring Prepare the fast-production system With beam, system checks and full-detector runs No beam: calibrations (IR access when available) On Friday, move the Silicon detectors in from the retracted position. 2Hubert van Hecke - 05 Mar 13
3
Criteria for start-of-physics 109 bunches in the machine Longitudinal polarization established, <5% transverse component >=55% polarization at the start of the store Beta* = 0.65 >1*10 11 protons/bunch 3Hubert van Hecke - 05 Mar 13
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.