Download presentation
Presentation is loading. Please wait.
Published byWinifred Boyd Modified over 9 years ago
1
1 Business Resource Efficiency Improvement Grant (BREIG) Steve Goodare YFM Business Development Regional Manager Manufacturing Advisory Service, Y&H BREIG scheme Coordinator
2
2 What can YFM Business Development do to help? >BREIG scheme financial support >MAS >Subsidised expert help from approved environmental practitioners >Projects from 1 day to 10 days duration >All classes of Yorkshire and Humber based manufacturers >Manufacturing Masters programme >Best practice sharing through Inside Industry
3
3 MAS specifics >Practical expert help from approved environmental practitioners >Projects from 1 day to 10 days duration >Energy, Waste, ISO+EMS, manufacturing improvements – leaner = greener >All classes of Yorkshire and Humber based manufacturers
4
4 Some MAS achievements >In the last 12 months MAS has completed:- >389 long term improvement projects >Average GVA over £80,000 >Saved over 8,000 tonnes of CO2 >Saved over 6,600 tonnes of waste + water >Over 20 environmentally related projects >Over 250 1 day environmental/energy reviews
5
BREIG Scheme Outline 5 Part of CO2Sense’s Resource Efficiency programme to stimulate projects to reduce environmental impacts Strictly for SMEs in Yorkshire and Humber region Capital equipment purchases only Outputs required, Substantial savings in:- CO2 emissions through energy use Raw material usage, land-filled waste etc. Water consumption
6
BREIG Scheme Outline 6 3 Types of grant available: Capital, the majority of the fund Capped at £8,000, minimum grant £500 Not exceeding 20% of overall equipment cost Consultancy, organised through the MAS network Capped at £2,000 Not exceeding 50% of the overall cost Training (funding of last resort) Capped at £500 per company Not exceeding 50% of the overall cost
7
Successful BREIG awards 7 Digital print machinery for fabrics, substantial savings in energy and water, considerable benefits in terms of sales potential and contribution to GVA Voltage Optimisation equipment for factory site, between 10- 15% reduction in electricity usage Waste wood used to replace gas in factory heating, saves energy AND diverts waste from landfill Combined heating and lighting efficiency projects Renewable energy installations
8
8 Breig achievements >Scheme awards so far will directly save:- >1,200 tonnes of CO2 >9,000 tonnes of waste + water >Over £200,000 cost savings
9
9
10
10 How to contact us 0113 368 5232 breig@co2sense.org.uk www.breig.co.uk Steve Goodare 0777 1373 444 Steve.goodare@yfmgroup.co.uk
11
FAQs >Does it affect Carbon Trust loans or ECA? >Is 20% guaranteed? >When would I get paid? >Is it difficult to apply? >Am I eligible? >How long does it take? >Any others? 11
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.