Presentation is loading. Please wait.

Presentation is loading. Please wait.

SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office.

Similar presentations


Presentation on theme: "SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office."— Presentation transcript:

1 SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office

2 Lane Closure System (LCS) An overview

3 Web-based system used to track closures and restrictions on Wisconsin State Highways Facilitate data sharing with WisDOT applications that require lane closure data, such as 511 Traveler Information and Oversize/Overweight (OSOW) permitting Improve the completeness, reliability, and timeliness of lane closure data on State Highways LCS Objectives

4 What closures should be tracked? – All let projects – Any planned maintenance or permit / utility work closure or restriction When should closures be entered? – 14 days - Project start, new lane closures, full roadway closure, change in width restriction, construction stage changes, ramp closures,detours – 14 days - New ramp closure (available width < or = 16’) – 3 days - Lane and service ramp closure (available width > 16’) System Use

5 Data Accuracy & Completing Closures It is critical that all closure information entered in the LCS be accurate – The closure information entered in the LCS is used to: Provide traveler information through WI’s 511 phone system and website http://www.511wi.gov/Web/map.aspx?region=southwest Issue OSOW permits, which has a direct impact on the movement of commerce through WI

6 http://transportal.cee.wisc.edu/closures Web Address

7 Closure Walk Through Type of facility ( mainline, ramp, bridge or system interchange ) Duration type ( daily/nightly, weekly, continuous or long term ) Closure is either a closure or restriction What’s closed ( single lane, left shoulder, left lane, 2 left lanes etc.. ) Closure location If the closure location is not listed, find the closest point and give a direction and distance from OSOW Restrictions ( place any restrictions that OSOW will use when creating routes / issuing permits ) If a full closure is selected, a detour route will need to be entered Other useful information about the closure should be placed in the external facilities box If more than 1 facility will be needed, the add facility button will allow for multiple entries Enter lane width available or height available

8 Work Zone Traffic Control Guides

9

10

11

12

13 Work Zone Traffic Control Proper Signing

14 WZ Traffic Control - NEW Pedestrians and Bicycle access. Be aware that new access requirements for pedestrians and bicyclists are being phased in. Applies generally in urban projects. Projects currently in design are including new standard detail drawings.

15 Sign sheeting

16 Sign mounting/height

17

18

19 Lane closed sign & barricade

20 Unacceptable Message and Sheeting Material

21 Work Zone Traffic Control TC Equipment

22 Portable changeable message sign (PCMS) messaging

23 Arrowboard Condition

24 DRUM Condition

25

26 Work Zone Traffic Control Flagging

27 FLAGGING Positioning & equipment

28 Flagging positioning & equipment

29 Equipment/material storage

30

31 Work Zone Traffic Control Personal Safety

32 Safety Apparel Chapter 6

33 Permanent Signing

34 Unacceptable Mounting

35

36 Standard Specification 637.2.4.2.2 Furnish a sign mounting system from the Departments approved products list. Signing contractor should order sign mounting brackets with plenty of lead time. Sign mounting hardware, including mounting brackets are incidental to signing bid item.

37 Approved Overhead Sign Support Mounting Bracket

38

39

40 Bid Items for Signs Most Common Types of Reflective Sheeting 637.1220 Signs Type 1 Reflective SH – Large Interstate / Freeway Signs mounted on steel I beams or overhead sign structure 637.2210 Signs Type 2 Reflective H – Regulatory and Directional Signs 637.2230 Signs Type 2 Reflective F – Warning and School Related Signs

41 Sign Manufacture Details in Plan See notes for sign type and sheeting type.

42 Special Sign Details – Shop Drawings are not Required Manufacturer shall use plan details. – Type 1 example

43 Special Sign Details – Shop Drawings are not Required Manufacturer shall use plan details. – Type 2 example

44 Signing and Marking Contact Information La Crosse Office – Iver Peterson – (608) 785-9060 – Eric Glindinning – (608) 795-9909 Madison Office – Erik Nilson – (608) 516-6571 – Jeff Holloway – (608) 516-6437

45 Joe Schneider Traffic – La Crosse Office 608 789-5959 Jim Romanowski, Traffic – Madison Office 608-246-5635 Questions?


Download ppt "SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office."

Similar presentations


Ads by Google