Download presentation
Presentation is loading. Please wait.
Published byDale Marshall Modified over 8 years ago
1
Open Workshop,Pisa, November 2002 VI Framework: Integrated Project Dependable Systems and Information infrastructure - Research and Exploitation DeSIRE CESI position in DeSIRE Giovanna Dondossola
2
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 2 CESI history large investments in testing facilities to qualify Italian electromechanical Industry skills on power system analysis for the development of the national grid CESI was founded in 1956 with the support of the Italian electrical utilities and electromechanical manufacturers and aimed at concentrating:
3
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 3 Our history Our history (continued) widening the range of services offered to the national & international market in the electro- energetic and environmental sectors developing “full range approaches and solutions” to the market r 2000. With the liberalization of the Italian Electrical System Enel Research is incorporated in CESI with the aim of:
4
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 4 The shareholders Enel 26% Terna 15% Interpower3% GRTN, Sogin12% ABB, Alstom, Ansaldo, Pirelli, Vatech, Siemens 29% Edison, Sondel, Aem Milan, Aem Turin, Endesa Italia, Eurogen 15% Share capital: 8.55 Million Euro Equity: 20.76 Million Euro
5
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 5 Personnel (01.03.02): 1052 Our figures Turnover 2001:123.7 million € Facilities area: 300,000 m 2
6
Open Workshop, Pisa, November 2002 VI Framework DeSIRE Our organization structure T & D Networks D. Lucarella Managing Director G. Santagostino Environment A. Pigini Industry, End Uses & Renewables A. Porrino Generation P. Motta Tests & Components V. Scarioni Certification U. Colombo Personnel, Organization & Quality L. Anelli Sales F. Giornelli Research & Product Development R. Buccianti Administration & Finance V. Della Bona Automation & Information Techn. A.R. Tiramani Business Units Departments
7
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 7 Dependability at CESI Research activities on system dependability are driven by the evolution of the Electric System the Electric System is a critical infrastructure electricity supply is substantial to economic and social life all other infrastructures depend on it growing interdependency from ICT infrastructure
8
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 8 Subprojects Infrastructure Inter-dependencies Electric Network Automation Systems Dependability Case Support tools for the formal analysis of dependability cases environment for the development of dependability cases Intrusion Management components of Test Lab for assessing the security of Electric Automation Systems Modelling and Simulation tools for modelling dependencies and simulating fault propagation in temporal logic tools for simulating dependable automation systems
9
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 9 Technologies fault prevention formal specification in temporal logic security policies and risk analysis formal design in automata based notations fault removal generation of temporal logic models property proof in temporal logic automatic generation of injection cases from specification testing and simulation with fault injection of distributed automata execution
10
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 10 cont. fault tolerance middleware approach intrusion tolerance redundant path routing fault forecasting system evaluation through measurements system evaluation through modelling
11
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 11 SERVICES FOR THE POWER DISTRIBUTION INDUSTRY CESI
12
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 12 CESI l SYSTEM PLANNING l DISTRIBUTED POWER GENERATION l POWER QUALITY l REMOTE METERING SYSTEMS l SUBSTATION AUTOMATION
13
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 13 SUBSTATION AUTOMATION CESI l AUTOMATION SYSTEMS FOR : u HV Transmission Substations u HV/MV Distribution Substations
14
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 14 SUBSTATION AUTOMATION Protection and Control System (SPC)
15
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 15 Test Environment
16
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 16 HW RTOS DEPAUDE Basic Services Layer LAN Monitor BackBone Application code Basic Software Executive Exchange Ram DEPAUDE interface
17
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 17 Graphical Interface
18
Open Workshop, Pisa, November 2002 VI Framework DeSIRE 18 CESI event CESI is member of Cigré WG 37-35 on Information technology development and its effect on the economy, security and market operation of power systems www.cigre-drustvo.si/slokcig/index-ANG www.cigre-drustvo.si/slokcig/index-ANG representatives from several European electric utilities a main goal: survey the technological development of Information Technology (IT) and its future trend in power sector next meeting in January 2003 hosted by CESI, involving major IT producers for power systems (ABB, SIEMENS, ALSTOM, SELTA,...) and Operators (GRTN)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.