1 Project Kick-off Meeting Professor Robin Smith Process Integration Limited Manchester 17 December 2010

2 History of the Project Background research and collaboration: EPSRC project (UK) in heat transfer intensification (2009 – 2011) Initiated by UNIMAN, PIL and CALGAVIN mid 2009 PIL assumed coordinating role (mid 2009) Submitted to FP7-SME-2010-1 (Dec 2009) Invitation to commence contract negotiations (March 2010) Negotiations completed end September 2010 Project commenced 1 December 2010

3 Project Overview Intensified Heat Transfer Technologies for Enhanced Heat Recovery - INTHEAT Contract number: 262205 Starting date: 1 December 2010 Duration: 24 months

4 Project Objectives Enhancing our understanding of heat exchange under fouling Technical innovation for heat transfer intensification for heat recovery Proposing new materials of improved economic and environmental performance as heat transfer media (with focus on advanced heat exchanger with polymer materials Combining enhanced heat transfer innovative design with process integration to achieve the synergy of novel technologies Demonstration of applicability and economic- environmental benefit of novel heat-transfer enhancement techniques and the new design methods proposed Effective technology transfer to the wide range academic and industrial communities

5 Partners Process Integration Limited (PIL), UK Cal Gavin Limited (CALGAVIN), UK Akstionernoe Obshchestvo ‘Sodrugestvo-T’ (SODRU), Ukraine Makatec Apparate GmbH (MAKATEC), Germany Oikos, svetovanje za razvoj, d.o.o. (OIKOS), Slovenia The University of Manchester (UNIMAN), UK University of Bath (UNIBATH), UK Paderborn University (UPB), Germany University of Pannonia (UNIPAN), Hungary EMbaffle B.V. (EMBAFFLE), The Netherlands

6 Work Package Structure Demonstration WP 1 Analysis of intensified heat transfer under fouling WP 2 Combined tube-side and shell-side heat exchanger enhancement WP 3 Heat Exchangers made of Plastic Materials WP 4 Design, retrofit and control of intensified heat recovery networks WP 5 Putting into practice WP 6 Technology transfer WP 7 Management RTD Exploitation Management

7 Contract specific terms Duration of the project is 24 months Commencement date: 1 December 2010 Maximum financial contribution by EC: EUR 1,155,000 Pre-financing at the level of EUR 693,000 (minus Guarantee Fund EUR 57,750) Reporting periods: –P1 from month 1 to month 9 –P2 from month 10 to the last month of the project

8 Contract specific terms Applicable law: terms of GA, EC and EU acts related to FP7, Financial Regulation application to the general budget and other EC and EU law, and on subsidiary basis, the law of Belgium Communication with EC through the coordinator

9 Contract specific terms Review number Tentative timingPlanned venue of review Comments, if any 1 Mid-term review meeting to be done after Month 11 Brussels RP1 (Month 9) + 75 days Go/No-go decisions will be based on the performance of the developed materials by Month 9  Overall project review  Monitoring WP progress and collaboration  Risk analysis/contingency measures  Corrective actions if needed WPs involved: WP1, WP2, WP3, WP6, WP7 2 Final review meeting within Month 26 Manchester Fine tuning of draft final reports (submitted in advance - 10 days berore) will be discussed  Overall project review  WP outcome (research, dissemination) review  Exploitation WPs involved: WP4, WP5, WP6, WP7

10 Milestones Milestone number Milestone nameWP numbersLead benefi­ ciary number Delivery date from Annex Comments M1.1Fouling mitigation research completed WP1 7 UNIBATH Month 12Complete set of experiments accomplished and mathematical models verified M2.1Software modules implementing tube- and shell side enhancement developed WP2 CALGAVIN Month 18Beta version tested M3.1Optimised design spiral wound plastic heat exchanger WP3 MAKATEC Month20Experimental comparison of prototype with standard type, and mathematical models verified M4.1Retrofit methodology for heat exchanger networks prone to fouling deposition developed WP4 6 UNIMAN Month 20Report submitted

11 Milestones M4.2Software tool for screening and analysis design and retrofit HEN options taking into account the intensified heat exchanger parameters WP4 6 UNIMAN Month 24Beta version developed and tested, user guide printed M5.1Case studies for methodology application in chemical, refinery and food industries carried out WP5 1 PIL Month 24Report submitted M6.1Training WorkshopWP6 9 UNIPAN Month 18Workshop completed M6.2Four Dissemination events attracting the European clusters carried out WP6 9 UNIPAN Month 8, 12, 18, 22 Four Dissemination event completed

12 Project Deliverables 19 deliverables of them 7 confidential, 12 public Deliverables shall be submitted to EU within 45 days following the end of the planned date The coordinator will distribute the template for the project deliverables in January Lead participant: Coordinates the preparation of the Deliverables, ensures contribution from partners is prepared on time, ensures quality of Deliverable

13 Project Deliverables Need to be submitted using the electronic system

14 Financial Guidelines Each SME (Contractor) should sign a sub- contracting agreement with RTD Partners (Sub-Contractors) who carry out the research work for them. The Coordinator will circulate draft sub- contracting agreement in next few days.

15 Financial Guidelines Suggested distribution of sub-contracting payments in line with the DoW’s Tables A3 and B3 1,050,000

16 Financial Guidelines Will be circulated among Partners

17 Financial Guidelines The pre-finance has been sent to the Coordinator, but due to technical issues had to be sent back to REA. The pre-finance is due to arrive in January-February. Pre-finance has been EUR 635,250 which is 635,250 / 1155000 = 0.55 of the overall requested EU contribution. Hence the prepayment will be distributed proportionally to the total EU contribution to each partner

18 Financial Guidelines Partner Requested EU contribution, € Prepayment € PIL245,600135,080 CALGAVIN255,000140,250 Sodrugestvo-T232,000127,600 MAKATEC221,000121,550 OIKOS177,00097,350 UNIMAN6,8003,740 UNIBATH4,4002,420 UPB4,4002,420 UNIPAN8,8004,840 EMBAFFLE00 Total1,155,000635,250 Estimated prefinance distribution

19 Project PM efforts

20 Decision Making Mechanism European Commission - Technical Officer Exploitation and Dissemination Management (WP 7) Coordinator (WP 7) Technical Management (WP 7) Steering Committee – decision making body (All Consortium Members) Workpackage Management (WP Committees / WP Leaders)

21 Consortium Agreement An updated version of the Consortium Agreement will be circulated at this meeting Amendments: in Exclusions section Please check carefully before we send the updated version to REA!

22 Future Meetings Planning June 2011 – your suggestions? Mid-term review meeting to be done after Month 11 (December 2011) – Brussels June 2012 – your suggestions? November 2012 – your suggestions?


Download ppt "Project Kick-off Meeting Professor Robin Smith Process Integration Limited Manchester 17 December 2010."