Download presentation
Presentation is loading. Please wait.
Published byAubrey George Modified over 9 years ago
1
CPD Report Mack Surveillance Panel June 2004
3
CPD Report Mack Surveillance Panel June 2004
4
Received shipment of small turbos –Two External differences –Internal the same CPD Report Mack Surveillance Panel June 2004 OldNew Old New
5
New supply of fuel injection lines received and distributed –Uses current Mack production fittings CPD Report Mack Surveillance Panel June 2004 OldNew
6
T-11 Cylinder Heads –732GB3494M2 replaced by 732GB3499M2 –New head uses 714GB3113 valve guide designed to reduce valve guide wear –TEI located and purchased as many of the original heads we could find –Currently 11 in inventory at TEI CPD Report Mack Surveillance Panel June 2004
7
Received 10 sets non-flashed rod bearing sets and main bearing sets –1 set rod bearings rejected due to surface defect –3 sets main bearings rejected due to surface defect on one bearing each set –Shipped bearings to SwRI, PE, Ethyl CPD Report Mack Surveillance Panel June 2004
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.