1 Statewide Modeling and Corridor Management CE 451/551 A good reference: http://onlinepubs.trb.org/onlinepubs/circulars/ec011/ec011.pdf

2 Presentation Outline Statewide Models Managing Access in Commuting Corridors

3 What is a Statewide Model? Very similar to a Metropolitan Area Travel Demand Model. Wider in scope! Many use the same sequential 4-Step Process Trip Generation Mode Split Trip Distribution Traffic Assignment Truck Model Freight Model Intercity Bus Air and Barge

4

5 Why Model Statewide? We are seeing the benefits modeling brings to urban areas. Technical basis behind big $ projects. In the rural area there is no such technical tool to support decision making. Currently use old fashioned hand-drawn methods to forecast traffic.

6 Why Model Statewide? Traffic forecasts affect every aspect of a State DOT’s core business activities. Planning, finance, programming, design, construction and maintenance. A useful, cost-effective tool System, corridor, project level analysis for evaluating needs and alternatives Consistent methodology Better than current DOT method. Two forecasters-two forecasts.

7 Why Model Statewide? Policy questions State Gas Tax Increase Project Prioritization Statewide VMT by geographic area to determine where dollars should be spent State Plan (like MPO Plan) Bypass Studies Corridor Studies Rural detour studies

8 Why Model Statewide? One major construction project costs millions of dollars. Shouldn’t it be based on the best available data?

9 Project Example US 218 – Charles City, Iowa Area. Avenue of the Saints. St. Louis, Missouri and St. Paul, Minnesota Systems Planning did a traffic forecast for pavement design. Old fashioned trend line growth analysis. We totally missed on the Truck percentages. Route experienced significant increases in truck volumes.

10 Maps from www.iowadotmaps.comwww.iowadotmaps.com

11

12

13 Project Example What happened? Asphalt pavement mix substandard for those truck weights. Result: Significant rutting. Too many dynamics taking place. Statewide Model likely benefit. Could have saved a lot of $.

14 Truck trends Percentage of Segments with Over 10,000 Trucks, Comparison of 1998 to 2020.

15 National Trend

16 Opportunity for Modelers Large Scale Plans require Huge Investments Need Computer Models to Help Decisions Statewide Model new in Iowa - MI had one in the 1960s see: http://onlinepubs.trb.org/onlinepubs/circulars/EC011/NELLET.PDF Built from Urban Knowledge Base Severely Lacking Intercity Data Lacking in Data Overall Survey Data

17 Data Collection is Key Data or Theory? Shortcomings in Both Behavioral Surveys are needed Origin Destination Surveys are needed Focused to Specific Corridors Economic Interaction Surveys Commodity Flow Surveys

18 Other States Louisiana Maine Virginia Texas Michigan Ohio Wisconsin Florida California New Hampshire North Carolina South Carolina Oregon Mississippi Vermont Missouri Kentucky Now Iowa

19 Statewide Modeling Capabilities Passenger Car Models Truck Models Freight Models Rail Models Intercity Bus Air Barge Intermodal Connections Time of Day Trip Purpose

20 Ohio Example

21 Nationwide Coverage

22

23

24 Coded Area Type

25 Virginia Example County Level Zones

26 Virginia Example County Level Zones to Larger Areas

27 Virginia Example Network Why is this road needed?

28 Kentucky Zone Example

29 Iowa’s Model will simulate this structure. BEA Business Economic Areas

30 Trip Generation Data Population Employment CTPP National Survey Data Reebie Data (now Global Insight): Transsearch database

31

32 Trip Purposes Home Based Work Home Based Non-Work Urban Non-Home Based (2,500 +) Rural Non-Home Based Tourist Truck and External Trips

33 Special Generators Intermodal Centers Tourist Attractions Etc.

34 Trip Distribution Even though there are issues the Gravity Model is the common choice Issue – Rural vs Urban Trip Lengths Trip Distances are Different Why we have both urban and rural trip purposes

35 Trip Assignment All or Nothing Capacity Restraint – Traditional Pre-Assignment of Trucks Ensures trucks stay on through routes Don’t use Equilibrium Assignment

36 Calibration vs Validation No Widely Accepted Standards Lenient FHWA standards apply. +/- 4,000 ADT

37 Typical Cost and Time Depends on Multimodal Detail Depends on Data Available Are Travel Surveys Needed? Range to Expect $300,000 - $2 million Or $6 million for Activity Based like Ohio Typically, a multi-year effort

38 Process to Identify High Priority Corridors for Access Management Near Large Urban Areas in Iowa David Plazak and Reg Souleyrette Center for Transportation Research and Education Iowa State University

39 Iowa DOT Access Priority Ratings (English Conversion) Source: Iowa DOT. RatingDescription 1Access points at interchanges only 2Access points spaced at minimum 2625 ft 3Access points spaced at minimum 984 ft rural, 656 ft urban 4Access points spaced at minimum 656 ft rural, 328 ft urban 5Iowa DOT has minimum access rights acquired 6Iowa DOT has no access rights acquired

40 Research Project Goals Address current and future access management problems on state highway routes located just outside urban areas that serve as major routes for commuting There were two basic goals for the project: Develop a ranking system for identifying high-priority segments for access management treatments on primary highways outside metro and urban areas. Focus efforts on routes that are major commuting routes at present and in the future An example commuting corridor: US 6 to the west of the Des Moines metropolitan area (on next slide)

41 US 6, In The Waukee Area

42 Technologies Used Arc View GIS was used to integrate various Iowa DOT databases, including roadway characteristics, traffic, and crash records A 2940 zone traffic model was developed to estimate and forecast commuting activity on all Primary routes Known model weakness: border metro areas

43

44 Iowa Forecast Population Growth By County Source: Woods and Poole Economics

45 Traffic Model Zone Structure Traffic Analysis Zones (TAZs) were developed from US Census Block Groups.

46 ArcView was used to find the center of each TAZ and then create a centroid at this location The centroids were then connected to the network at breaks in the existing network

47 To reduce the number of segments and nodes between intersections, ArcInfo was used to combine multiple segments into a single link ArcView was then used to create node and link files formatted for use in TRANPLAN

48 Base-year Estimated Traffic Model Commuting Trip Volume

49 5-Year Estimated Traffic Model Commuting Trip Volume

50 Forecast Absolute Change In Commuting, 1999-2004

51 Forecast Percentage Change In Commuting, 1999-2004

52 Access-Related Crashes Included In The Analysis Collision TypeDescription 4Rear-end/right-turn collision 5Rear-end/left-turn collision 12Broadside/right-angle collision 13Broadside/right-entering collision 14Broadside/left-entering collision

53

54 Ranking Factors Used Frequency Rate Loss/Severity Percentage Access Related

55 Access-Related Crash Losses on Commuter Routes by Iowa DOT District District Crash Loss Access Crash Loss Access Related Ratio District to State Ratio 1 $19.3B $4.1B 21.45%54.52% 5 $9.1B$1.7B 18.51%22.41% 6 $5.8B$830M 14.23%10.93% 2 $1.8B $490M 26.26%6.43% 4 $1.3B$350M 25.66%4.65% 3 $750M$80M 10.63%1.05% Total $38.2B$7.0B 20.00%100.00%

56 Red circles indicate pilot projects

57 “Pro-Active Corridors” Some corridors may not have access-related crash problems today, but could have in the future “Pro-Active Corridors” were identified based on the following factors: Forecast commuting traffic growth Proximity to metro and large urban areas Access priority ranking of 3, 4, 5, 6, or none Driveway access density

58

59 Most Access Management Problems Happen Incrementally Poorly managed corridors don’t happen overnight; they happen over many years They often happen one decision at a time A series of decisions is usually involved in degrading a corridor What can one more median opening hurt? One more commercial driveway? One more traffic signal? The problem is that all the small, bad decisions cumulate into one large problem—a “hairball”, to use computer programming slang

60 For another example of a specialty statewide model, see the second half of last week’s freight lecture.