Presentation is loading. Please wait.

Presentation is loading. Please wait.

TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto.

Similar presentations


Presentation on theme: "TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto."— Presentation transcript:

1 TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto Deviation Expiration Notifications Auto Update for ERD Charted Part Detail View Drawings Link on ERD ‘Request Page’ View Platforms Affected EARs, Shows all Platforms Access to Specific ERD Information for JV, Contractors

2 2 TRW Overview of Updates for WCRS User Community  Deviation Extension Auto Notify: Notifies the Creator and Plant Facilitators 14 days prior to the Deviation expiration date. This function places a Task in both the Creator and the Plant Facilitator work list when the deviation is about to expire and gives them the option to extend. (Slide 3) (CR123)  Auto Updates for Charted Parts: Allows the Creator of a document to place a chart on the Part Details of an ERD and choose the “Add Described Parts” button, this displays all associated parts to that chart. Once the Creator selects the appropriate “Change Type” for each part affected these parts will appear on the Part Detail of the ERD. When the chart is once again updated it will carry all part numbers forward unless they were remove from one chart an applied to another. (Slide 4) (CR109)  A Feature Added to the ERD Request Page: The “View Drawing/Document” link has been added to the first page of the ERD to view all drawings. This was only available on the Part Details page in the past. You may notice another link ‘Share to Non TRW’, that the ECC/PRA can use to enable access for a contractor or joint venture employee where the ERD is moved to a secure area for this Non-TRW location. (Slide 5) (CR142)  The Deviation, GI and P & R Request Page “View Platforms Affected” link has been upgraded to display all platforms but distinguish their affects on this particular routing as (Yes) or (No). (CR136,7,8)  A performance feature has been added on the over all system. System pop up windows that are not necessary for to expedite the gathering and displaying of data have been removed. (CR142) There are new system updates for the creation and viewing of ERD’s & EAR’s within the WCRS system. They are summarized below and further described on the following slides for your reference. Please review now and see your local engineering change management group with any questions.

3 3 TRW Auto Deviation Extension Notification The system will Send a TASK to the Creator and Plant Facilitator (S), *14 days prior to the Deviation Expiration date. Choose whether an Extension is Required or Not for that Released Dev, this response is recorded into the Dev after {**Task Complete}. When an Extension is Required; the system checks for the Created Deviation prior to allowing the Task complete. After the Task Complete all other pending user Tasks are removed from their Work Lists. Note: Use the {COPY DEV} link to quickly create an extension) A Copied Deviation will now have a link displayed from the source Dev. * Deviations authorized over 90 days the Task notification is 30 prior to the expiration. ** If the User does not respond to the Task, “No User Response” is entered into the Released Deviation 7 days after the Deviation has expired. Deviation Extension - Auto Notify Prior To Expiring If EXT is Required enter New Deviation # Extension Required (or) No Extension Required

4 4 TRW Auto Updates to Parts on a Chart Chart Part Association First add your released Chart number to the Part Details page of the ERD. Select a specific chart number from the Existing Part Details Display and Select the ‘Add Described Parts’ button. All part numbers associated with that particular chart number will appear. The user can select affected Part Numbers by checking the box left of the part number. Next choose the “Change Type” for each. Now select Finished Button located at bottom of the window (not shown), and “Close” the system message indicating a successful activity. All the parts that were selected will appear on the Part Details page. The Change Summaries will display the same information that was on the Part Detail of the Chart (as all text was copied) Note: The user can update the text for each part individually, as needed while in Create status. System will display this message

5 5 TRW View Drawings/Document Link and Share to Non-TRW View Drawings/Document Link and New Share to Non-TRW Link and The View Drawings and Documents link is now located on the ERD Request Page (Opening Page) in addition to the part detail page. The Share to Non TRW link will allow a PRA/ECC to activate a location where users with this type of system identification will be able to access information from a specific ERD. The Link will change text to Remove Share to Non TRW link when activated.


Download ppt "TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto."

Similar presentations


Ads by Google