March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study
2
2 Agenda Review: Building Diagrams Opinion of Probable Costs Schedule: Timeline for Completed Study Questions and Discussions
3
3 Progress Tasks Completed to Date Existing drawings reviewed Site visits performed to collect initial data General observation made of site drainage, adjacent site improvements and visible utility services Meeting with City of Altoona to discuss known utility routing and storm water conveyance structures Met with staff December 17 th to gather program information Developed Conceptual Building Diagrams Utility Survey Completed Probable Costs Re-evaluated Conceptual Building Diagrams Updated (Parish Hall Scheme A & D – Faith Development Center Scheme B & D Conceptual Building Diagrams Updated (Parish Hall Scheme A3 – Faith Development Center Scheme B3, B4 E & F) Draft of Feasibility Study Completed Parish Hall Scheme A3.1 & Faith Development Center B4.1
4
4 Building Concepts Parish Hall Addition Scheme A3 Enlarged Paris Hall to seat 512 Kitchen: 1000 sf
5
5 Building Concepts Parish Hall Addition Scheme A3.1 7630 sf Parish Hall (can be expanded) Seating Capacity 384- 500 967 sf Kitchen serving Parish Hall Dish pit and dish storage 120 sf Dry Storage = 60 sf Walk-in refrigerator = 80 sf, add 32 sf for freezer Cold line(s) = 120 sf/cook (includes reach-in refers) Hot line(s) =80 sf/cook (sauté, Broiler, Deep fry, etc. (includes cooking equipment and plating area) Pass 60 sf (6'x10') This adds up to around 600SF to serve 350 individuals Men’s & Women’s Restrooms (4 Fixtures/ 2 Lavatories each) 505 sf Table & Chair Storage 65 round tables (end) – 70 sf 65 flat stack tables – 140 sf 500 folding chairs – 150 sf 500 stacking chairs – 100 sf Worse Case 290 sf to 320 sf required
6
6 Building Concepts Scheme A3.1 Scheme B4.1 Parish Hall & Faith Dev. Center Scheme A3.1 & B4.1 A3.1 deletes 32-34 parking spaces B4.1 deletes 0 parking spaces Existing trash enclosure would be relocated Access to North/South parking lot eliminated (opt: access drive east of FDC) Existing water main to remain Fire rate east exterior wall of Parish Hall
7
7 Building Concepts Faith Development Center Scheme B4 3,500 sf Addition New Entry off North Wing 6 double classrooms (600+ sf each) ± 1,400 sf Childcare Center & Youth Ministry ± 1,650 sf Activity Room Add ADA Showers near Mech. Room. Toilets/ Kitchenette added for Youth Ministry Faith Formation Directors Office included within Workroom Kitchen expanded with secondary exit off existing Activity Room/ new Childcare Center
8
8 Building Concepts Faith Development Center Scheme B4.1 3,450 sf Addition New Entry off North Wing 6 double classrooms (600 sf ea.) 1,412 sf Childcare Center 1,464 sf Youth Ministry 1,740 sf Activity Room (can be reduced to enlarged) Add ADA Showers near Mech. Room. Toilets/ Kitchenette added for Youth Ministry Faith Formation Directors Office included within Workroom Secondary exit off existing Activity Room/ new Childcare Center STOR
9
9 Probable Costs Size: 18,500 sq. ft. addition and 269,000 sq. ft. renovation Cost: $22.5M base bid Site Improvements $225,000 - $275,000 Utility Modifications $150,000 East Drive Connection $40,000 - $50,000 Misc. Paving & Landscaping Opinion of Probable Cost - $265,000 to $325,000 Optional: Add East Drive - $415,000 to $475,000 Building & Components Parish Hall Addition (Scheme A3.1-12,500 sf) - $2,500,000 to $2,800,000 Faith Development Ctr. Add. (Scheme B4.1 -3,500 sf) - $650,000 to $700,000 Faith Development Renovation - $150,000 to $175,000 1985 Building Renovation - $320,000 to $370,000 Opinion of Probable Cost - $3,620,000 to $4,045,000 Optional: Add Sanctuary Addition - $545,000 to $615,000 Total Estimated Cost Range - $3,885,000 to $4,370,000 (w/o Sanctuary Add.)
10
10 Schedule Next Steps Incorporate information gathered to date and complete feasibility study