Download presentation
Presentation is loading. Please wait.
Published byEaster Matthews Modified over 9 years ago
1
AIRFIELD PAVEMENT PERFORMANCE ISSUES AND RESEARCH NEEDS - AN AIRPORT OPERATOR’S PERSPECTIVE FAA AIRPORT PAVEMENT WORKING GROUP MEETING APRIL 25, 2012
2
Port Authority of NY&NJ Airport Operations JFK LGA TEB EWR SWF
3
Pavement Performance Issues
4
Shoving of the Surface of HMA Runway Pavements
5
HMA Paving Joint Performance
6
Eight to Ten Year HMA Surface Service Life
7
PCC Joint Fraying and Spalling
8
8 Skilled Contracting Workforce
9
Reduced Maintenance Budgets and Staff
10
Research Needs
11
Field Test Program
12
Grooved Asphalt Pavement Preservation Treatment
13
Joint Spacing
14
3D Pavement Optimization
15
Porous Pavement
16
High Recycled Material Content
17
Quick Durable Repairs
18
Engage the Airport Operators
19
THE END Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.