Presentation is loading. Please wait.

Presentation is loading. Please wait.

110-10-05 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.

Similar presentations


Presentation on theme: "110-10-05 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer."— Presentation transcript:

1 110-10-05 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science and Engineering, University of Mälardalen, Västerås, Sweden and at the Faculty of Electrical Engineering and Computing, University of Zagreb, Croatia (year 2010/2011). For all other purposes, authors’ written permission is needed! The purpose of these materials is to help students in better understanding of lectures in DSD and not their replacement! NOTICE!

2 210-10-05 Distributed Software Development

3 310-10-05 Public Transportation System Product Line Manish Kungwani

4 410-10-05 Overview Demo Integration Process Project Schedule Important Events Other Experiences

5 510-10-05 Project Schedule Week 49 Umple model is complete Includes 100% requirements Java Unit Testing nearly complete, 98% done 2 Instances under Parallel Development Database for Instances made (With a real system’s data – Lausanne, Switzerland) Documentation of Umple Model done Data Access Layer 50% complete

6 610-10-05 Project Schedule contd.. Week 53 We present the Product Line with at least 3 instances.

7 710-10-05 Important Events Week 46 Finalization of Umple Model Decisions regarding DAL and usage Week 47 Umple code was patched with Minor changes Documentation done in model SRS and Acceptance Test Plan were started Complete Re-testing due to faulty testing

8 810-10-05 Important Events contd.. Week 48 All major changes in Umple were done Testing carried on Communication issues Many problems with Umple code Database creation started Week 49 Database complete Umple Model, Testing and Documentation done Instance work continued

9 910-10-05 Project Development Process Current Development Process: Umple Model minor changes, minor testing jobs DAL development Two instances being developed (one in Croatia and another in Sweden) Looking at possible Inter-Project Integration with EzFare group

10 10-10-05 How much we work? MemberW38W39W40W41W42W43W44W45W46W47W48W49Total Augustin Petrović1419161018171356.52521.51333256 Uma Shankar Subramani1315121310 1720322517175 Hafiz Umer Waqar 149121814 1019 201817.5184.5 Siva Chaitanya Nayak Eslavath0448111011162021.520.519.5145.5 Manish Kungwani1517121417 145428 1336265 Pratik Bapurao Barkade13461514 121819171615.5163.5 Omar Tawffeeq Jaradat221812181614172024201811210 Total91726795103 872011551601241501400

11 10-10-05 How much we work?

12 10-10-05 How much we work?

13 10-10-05 How much we work on Umple?

14 10-10-05 How much we work on Umple?

15 10-10-05 How much we work on Tests?

16 10-10-05 How much we work on Tests?

17 10-10-05 How much we work on Instance? (Croatian Side)

18 10-10-05 How much we work on Instance? (Croatian Side)

19 10-10-05 How much we work on Instance? (Swedish Side)

20 10-10-05 How much we work on Instance? (Swedish Side)

21 2110-10-05 Other Experiences Umple Too many problems, no solution yet No validation possible No exception handling possible No repository listening possible Difficulties in writing the DAL and Instance due to incapability of Umple Team Under Performance Issues

22 2210-10-05 Other Experiences (contd..) Man crossing Niagra Falls

23 2310-10-05 Other Experiences (contd..) We using Umple!

24 Thank You! Any Questions or Queries? 10-10-05 Što? What? Vad? Was?


Download ppt "110-10-05 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer."

Similar presentations


Ads by Google